VERIFIED SOLUTIONS 100%|GRADE A+|LATEST 2024/2025
A track outside the limits of a manual interlocking, a control point, or a remotely
controlled Hump Yard - ✔ ✔ Which of the following locations permits the use of
individual train detection?
Notify the Train Dispatcher that no employees have been granted authority to
jointly occupy the working limits.
State the name of each employee that he/she has authorized to jointly occupy the
working limits and the time each cleared - ✔ ✔ When releasing working limits to
the Train Dispatcher the employee holding authority shall....
(select all that apply)
No - ✔ ✔ Forman Brown is by himself and needs to inspect a power switch in
Control Point Beta. Can he use individual train detection as his form of protection?
Forman - ✔ ✔ Who has overall responsibility for inspecting and maintaining on-
track equipment assigned to them?
working limits - ✔ ✔ Roadway Workers jointly occupying working limits under
the authority of a Roadway Worker in Charge (RWIC) must report the position of
any switches operated to the RWIC when reporting clear of the...
To refer to a rule, timetable, or special instruction - ✔ ✔ Employees may use any
electronic device for this excepted task, if such use does not interfere with any
employees performance of safety related duties
No Part may be filled out in advance - ✔ ✔ What part of a Track Authority Form
may be filled out in advance of receiving information from the Train Dispatcher?
Working limits
Track authority Number
Any Restrictions - ✔ ✔ For the purpose of double-copying a Track Authority
what information is required to be double copied?