• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

CDC 3E251 Volume 3 Exam Questions And Correct Answers 100% Pass

Document preview thumbnail
Preview 2 out of 11 pages

©BRAINBARTER EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e CDC 3E251 Volume 3 Exam Questions And Correct Answers 100% Pass What method can you use to ensure perfectly square corners when laying out an area for concrete? - Answers3, 4, 5 method What is the ONLY real difference between laying out a large area and a small area? - AnswersAmount of work You should place the first centerline stake for a large concrete project at the - AnswersBeginning of the project Which piece of equipment is NOT recommended for excavating large areas? - AnswersBackhoe The base course distributes wheel load stresses to the - AnswersSubgrade What two construction materials can you recycle to use for other purposes? - AnswersAsphalt and concrete The AREA of a rectangle 8 feet by 12 feet is 96 - AnswersSquare feet What is the rounded numerical value of Pie? - Answers3.14 ©BRAINBARTER EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e What is the APPROXIMATE area of a circle that measures 18 feet in diameter? - Answers254 square feet What is directly or indirectly responsible for MOST pavement failures and deterioration? - AnswersWater Which of these conditions is NOT a function of subsurface drainage? - AnswersRaise the water table If you are installing culverts or storm drains, the bottom of the trench should be - AnswersShaped to fit the pipe Notches are created in the center of check dams to - AnswersAllow for the normal flow of water What can you do if you want to funnel water into the inlet of a culvert? - AnswersFlare the end walls French drains are NOT recommended for permanent construction because they have - AnswersA tendency to silt up You should treat the bottom of vertical dry wells with calcium chloride or hay to - AnswersPrevent freezing Holes in perforated pipe should be placed UP when the - AnswersStructure is to be placed along the side of the pavement

Content preview

©BRAINBARTER EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.




CDC 3E251 Volume 3 Exam Questions And
Correct Answers 100% Pass


What method can you use to ensure perfectly square corners when laying out an area for

concrete? - Answers✔3, 4, 5 method


What is the ONLY real difference between laying out a large area and a small area? -

Answers✔Amount of work


You should place the first centerline stake for a large concrete project at the -

Answers✔Beginning of the project


Which piece of equipment is NOT recommended for excavating large areas? -

Answers✔Backhoe


The base course distributes wheel load stresses to the - Answers✔Subgrade


What two construction materials can you recycle to use for other purposes? - Answers✔Asphalt

and concrete


The AREA of a rectangle 8 feet by 12 feet is 96 - Answers✔Square feet


What is the rounded numerical value of Pie? - Answers✔3.14

1|Page

, ©BRAINBARTER EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
What is the APPROXIMATE area of a circle that measures 18 feet in diameter? - Answers✔254

square feet


What is directly or indirectly responsible for MOST pavement failures and deterioration? -

Answers✔Water


Which of these conditions is NOT a function of subsurface drainage? - Answers✔Raise the

water table


If you are installing culverts or storm drains, the bottom of the trench should be -

Answers✔Shaped to fit the pipe


Notches are created in the center of check dams to - Answers✔Allow for the normal flow of

water


What can you do if you want to funnel water into the inlet of a culvert? - Answers✔Flare the

end walls


French drains are NOT recommended for permanent construction because they have -

Answers✔A tendency to silt up


You should treat the bottom of vertical dry wells with calcium chloride or hay to -

Answers✔Prevent freezing


Holes in perforated pipe should be placed UP when the - Answers✔Structure is to be placed

along the side of the pavement



2|Page

Document information

Uploaded on
December 2, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainbarter
3.6
(58)
Sold
367
Followers
159
Items
22996
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions