12/2/24, 2:09 ICC GR Test Question Review
AM
ICC GR TEST QUESTION REVIEW
(ANSWERED) RATED 100%
CORRECT!!
1 of
92
Ter
m
Discussions about the frequency of reporting from the
special
inspection agency should be handled ultimately with
Give this one a try
later!
The building official
RDP, Building Official
,12/2/24, 2:09 ICC GR Test Question Review
AM
The grout of masonry walls, nailing type parters and locations in a wood
diaphragm, and the application of fire stopping material
The building department, to understand how frequently they want to
receive, and review the reporting and to whom the reports should go as
the project contact
Don't
know?
2 of 92
Term
Which one of the following duties does not apply to the
registered design professional?
Give this one a try later!
Submit the statement of special
inspections. Conduct preconstruction meeting
Approve the statement of Instruct the contractor how to
special inspections perform his work.
Don't know?
3 of 92
Term
,12/2/24, 2:09 ICC GR Test Question Review
AM
According to the special inspection manual, a
manufacturer who wants to use a new or alternate product
than what has been
prescribed by the IBC, will typically apply for an evaluation
report if
the product has been available for ___ or more years
Give this one a try later!
IV
II
Sufficient staffing of competent, qualified personnel, the major players
understand the responsibilities, setting approval criteria for the inspectors.
5
Don't
know?
4 of 92
Definition
is in addition to inspections conducted by the building
official.
Give this one a try later!
, 12/2/24, 2:09 ICC GR Test Question Review
AM
The special inspector shall
The engineer of record demonstrate competence to the
satisfaction of the
The special inspection
The engineer of record
process
Don't
know?
5 of 92
Term
What items are required to be listed in a
nonconformance/discrepancy report
Give this one a try later!
Client feedback, contractor List of all workers on site,
performance metrics, and future project completion date, and
project recommendations budget overruns
Who is notified of the
nonconformance and how,
description and location of Summary of daily activities,
the nonconformance, and equipment used, and safety
reference to applicable incidents
detail in the plans
Don't
know?
AM
ICC GR TEST QUESTION REVIEW
(ANSWERED) RATED 100%
CORRECT!!
1 of
92
Ter
m
Discussions about the frequency of reporting from the
special
inspection agency should be handled ultimately with
Give this one a try
later!
The building official
RDP, Building Official
,12/2/24, 2:09 ICC GR Test Question Review
AM
The grout of masonry walls, nailing type parters and locations in a wood
diaphragm, and the application of fire stopping material
The building department, to understand how frequently they want to
receive, and review the reporting and to whom the reports should go as
the project contact
Don't
know?
2 of 92
Term
Which one of the following duties does not apply to the
registered design professional?
Give this one a try later!
Submit the statement of special
inspections. Conduct preconstruction meeting
Approve the statement of Instruct the contractor how to
special inspections perform his work.
Don't know?
3 of 92
Term
,12/2/24, 2:09 ICC GR Test Question Review
AM
According to the special inspection manual, a
manufacturer who wants to use a new or alternate product
than what has been
prescribed by the IBC, will typically apply for an evaluation
report if
the product has been available for ___ or more years
Give this one a try later!
IV
II
Sufficient staffing of competent, qualified personnel, the major players
understand the responsibilities, setting approval criteria for the inspectors.
5
Don't
know?
4 of 92
Definition
is in addition to inspections conducted by the building
official.
Give this one a try later!
, 12/2/24, 2:09 ICC GR Test Question Review
AM
The special inspector shall
The engineer of record demonstrate competence to the
satisfaction of the
The special inspection
The engineer of record
process
Don't
know?
5 of 92
Term
What items are required to be listed in a
nonconformance/discrepancy report
Give this one a try later!
Client feedback, contractor List of all workers on site,
performance metrics, and future project completion date, and
project recommendations budget overruns
Who is notified of the
nonconformance and how,
description and location of Summary of daily activities,
the nonconformance, and equipment used, and safety
reference to applicable incidents
detail in the plans
Don't
know?