Advance Rigger Test – Questions And Correct Answers
What his hmeant hby hthe hterm h"two hblocking"?
a. hPlacing hblocks hunder hthe houtrigger hbeams.
b. hThe hload hblock hcontacts hthe hboom hpoint hsheaves.
c. hStacking hloads hon htop hof hone hanother.
d. hThe hload hstrikes hthe hboom hwhile hswinging. h- hANS-b. hThe hload hblock hcontacts hthe hboom
h point hsheaves.
Lifting h20,000 hlbs hwith ha h2-leg hbridle hsling hat ha h30° hhorizontal hsling hangle, hwhat his hthe
h force happlied hto heach hleg?
a. h10,000 hpounds
b. h20,000 hpounds
c. h30,000 hpounds
d. h40,000 hpounds h- hANS-b. h20,000 hpounds
In hmultiple hcrane hlifts husing han hequalizer hbeam, hthe hweight hof hthe hbeam hshould hbe
h considered:
a. hPart hof hthe hcrane hboom h
b. hPart hof hthe hload hweight
c. hPart hof hthe hcrane hweight
,d. hA hnon-factor h- hANS-b. hPart hof hthe hload hweight
What his hrequired hif hthere his ha hdeviation hfrom hthe hlift hplan?
a. hThe hsupervisor's hpermission
b. hThe hrigger's hpermission
c. hA hnew hlift hplan
d. hMark hups hon hthe hexisting hlift hplan h- hANS-c. hA hnew hlift hplan
On hlevel hground husing hskids hand hrollers, hwhat hpercent hof hthe hweight hof hthe hload hshould
h yield hthe hrequired hline hpull has ha hgeneral hrule hof hthumb?
a. h2%
b. h5%
c. h10%
d. h20% h- hANS-b. h5%
All hof hthe hfollowing hare hresults hof hunbalanced hreeving hof hthe hhook hblock hEXCEPT:
a. hWear hon hthe hsheaves
b. hTorque hon hthe hboom
c. hWear hon hthe hhook
d. hWear hon hthe hwire hrope h- hANS-c. hWear hon hthe hhook
Before ha hspreader hbar hor hbeams hcan hbe hused hthey hMUST hhave hbeen:
a. hRepainted
, b. hUsed hbefore
c. hTested hand happroved
d. hUpgraded hfrom hthe hprevious hjob h- hANS-c. hTested hand happroved
When hmaterials hare hbeing hhoisted hto han hupper hlevel, ha htag hline his hused hto:
a. hHelp hraise hthe hload
b. hHelp hcontrol hthe hload
c. hStop hthe hprocess
d. hStop hmaterial hfrom hfalling h- hANS-b. hHelp hcontrol hthe hload
Two hcranes hare hlifting h100 htons. hIf hcrane hA hhas h40% hof hthe hload, hhow hmuch hweight hwill
h crane hB hhave hon hits hhook?
a. h60,000 hlbs
b. h80,000 hlbs
c. h120,000 hlbs
d. h240,000 hlbs h- hANS-a. h60,000 hlbs
To hCONFIRM hthe hrated hcapacity hof ha hspecific hsling, hconsult hthe hmanufacturer's:
a. hSling hchart
b. hWebsite
c. hSling htag
d. hCatalog h- hANS-c. hSling htag
What his hmeant hby hthe hterm h"two hblocking"?
a. hPlacing hblocks hunder hthe houtrigger hbeams.
b. hThe hload hblock hcontacts hthe hboom hpoint hsheaves.
c. hStacking hloads hon htop hof hone hanother.
d. hThe hload hstrikes hthe hboom hwhile hswinging. h- hANS-b. hThe hload hblock hcontacts hthe hboom
h point hsheaves.
Lifting h20,000 hlbs hwith ha h2-leg hbridle hsling hat ha h30° hhorizontal hsling hangle, hwhat his hthe
h force happlied hto heach hleg?
a. h10,000 hpounds
b. h20,000 hpounds
c. h30,000 hpounds
d. h40,000 hpounds h- hANS-b. h20,000 hpounds
In hmultiple hcrane hlifts husing han hequalizer hbeam, hthe hweight hof hthe hbeam hshould hbe
h considered:
a. hPart hof hthe hcrane hboom h
b. hPart hof hthe hload hweight
c. hPart hof hthe hcrane hweight
,d. hA hnon-factor h- hANS-b. hPart hof hthe hload hweight
What his hrequired hif hthere his ha hdeviation hfrom hthe hlift hplan?
a. hThe hsupervisor's hpermission
b. hThe hrigger's hpermission
c. hA hnew hlift hplan
d. hMark hups hon hthe hexisting hlift hplan h- hANS-c. hA hnew hlift hplan
On hlevel hground husing hskids hand hrollers, hwhat hpercent hof hthe hweight hof hthe hload hshould
h yield hthe hrequired hline hpull has ha hgeneral hrule hof hthumb?
a. h2%
b. h5%
c. h10%
d. h20% h- hANS-b. h5%
All hof hthe hfollowing hare hresults hof hunbalanced hreeving hof hthe hhook hblock hEXCEPT:
a. hWear hon hthe hsheaves
b. hTorque hon hthe hboom
c. hWear hon hthe hhook
d. hWear hon hthe hwire hrope h- hANS-c. hWear hon hthe hhook
Before ha hspreader hbar hor hbeams hcan hbe hused hthey hMUST hhave hbeen:
a. hRepainted
, b. hUsed hbefore
c. hTested hand happroved
d. hUpgraded hfrom hthe hprevious hjob h- hANS-c. hTested hand happroved
When hmaterials hare hbeing hhoisted hto han hupper hlevel, ha htag hline his hused hto:
a. hHelp hraise hthe hload
b. hHelp hcontrol hthe hload
c. hStop hthe hprocess
d. hStop hmaterial hfrom hfalling h- hANS-b. hHelp hcontrol hthe hload
Two hcranes hare hlifting h100 htons. hIf hcrane hA hhas h40% hof hthe hload, hhow hmuch hweight hwill
h crane hB hhave hon hits hhook?
a. h60,000 hlbs
b. h80,000 hlbs
c. h120,000 hlbs
d. h240,000 hlbs h- hANS-a. h60,000 hlbs
To hCONFIRM hthe hrated hcapacity hof ha hspecific hsling, hconsult hthe hmanufacturer's:
a. hSling hchart
b. hWebsite
c. hSling htag
d. hCatalog h- hANS-c. hSling htag