1. I do a ____ after replacing a spout to a Healy 900 nozzle - Correct answer.shut off test
b
2. In a balance hose the gasoline flows in - Correct answer.Inner hose
3. After the installation of the vapor piping and before back filling, PEI 300 suggests some methods to
document piping layout, except? - Correct answer.Drawing with a pen, pipe layout on the cover of the
tank manual.
4. During VO-1000 you don't - Correct answer.Work without eye protection
5. An Overfill Alarm device needs to be located - Correct answer.Where it can be heard or seen by the
delivery location.
6. When in a GDF you can avoid the installation of UDC? - Correct answer.No exceptions of any GDF.
7. What is considered an Underground Storage Tank? - Correct answer.Tank and pipping only
8. Gasoline vapors are 3/4 times _____ than air - Correct answer.Heavier
9. Compounds with a high vapor pressure such as gasoline will evaporate readily and will typically -
Correct answer.Have a low Flashpoint.
10. The ____ is the valve that controls pressure and vacuum on the tank. - Correct answer.P/V Valve
, 11. The vapor piping must be all, but not - Correct answer.Compatible with underground environment.
12. The Shear Valve is installed ____ - Correct answer.At the base of the dispenser.
13. What is the max length of a Healy Hose Phase 2? - Correct answer.20 Feet.
14 A ___ is a component of the hanging hardware that separates when it's applied a force? - Correct
answer.Breakaway.
15. UL listed means all except : - Correct answer.Worldwide Approved.
16. After a drive off, a technician should not - Correct answer.Ask attendant to fill out a drive off accident
report.
17. The executive order 201-A says that the reconnection of the breakaway needs to be - Correct
answer.Logged in the maintenance GDF.
18. What is not a secondary containment testing method? - Correct answer.Statistical Inventory
Reconciliation.
19. The air clean seperator must be located in the GDF - Correct answer.No more than 100 ft from the
vent riser.
20. The PEI-500 recommends that to avoid being shocked by electricity or soaked with gasoline that? -
Correct answer.You must disconnect power to all electric devices.
21. Which of these refer to a vapor recovery stage 1? - Correct answer.Delivery of gasoline and UST.
22. Which is not part of the hanging hardware? - Correct answer.Shear Valve
QUESTIONS AND VERIFIED
RATIONALIZED ANSWERS
100%GUARANTEED PASS
1. I do a ____ after replacing a spout to a Healy 900 nozzle - Correct answer.shut off test
b
2. In a balance hose the gasoline flows in - Correct answer.Inner hose
3. After the installation of the vapor piping and before back filling, PEI 300 suggests some methods to
document piping layout, except? - Correct answer.Drawing with a pen, pipe layout on the cover of the
tank manual.
4. During VO-1000 you don't - Correct answer.Work without eye protection
5. An Overfill Alarm device needs to be located - Correct answer.Where it can be heard or seen by the
delivery location.
6. When in a GDF you can avoid the installation of UDC? - Correct answer.No exceptions of any GDF.
7. What is considered an Underground Storage Tank? - Correct answer.Tank and pipping only
8. Gasoline vapors are 3/4 times _____ than air - Correct answer.Heavier
9. Compounds with a high vapor pressure such as gasoline will evaporate readily and will typically -
Correct answer.Have a low Flashpoint.
10. The ____ is the valve that controls pressure and vacuum on the tank. - Correct answer.P/V Valve
, 11. The vapor piping must be all, but not - Correct answer.Compatible with underground environment.
12. The Shear Valve is installed ____ - Correct answer.At the base of the dispenser.
13. What is the max length of a Healy Hose Phase 2? - Correct answer.20 Feet.
14 A ___ is a component of the hanging hardware that separates when it's applied a force? - Correct
answer.Breakaway.
15. UL listed means all except : - Correct answer.Worldwide Approved.
16. After a drive off, a technician should not - Correct answer.Ask attendant to fill out a drive off accident
report.
17. The executive order 201-A says that the reconnection of the breakaway needs to be - Correct
answer.Logged in the maintenance GDF.
18. What is not a secondary containment testing method? - Correct answer.Statistical Inventory
Reconciliation.
19. The air clean seperator must be located in the GDF - Correct answer.No more than 100 ft from the
vent riser.
20. The PEI-500 recommends that to avoid being shocked by electricity or soaked with gasoline that? -
Correct answer.You must disconnect power to all electric devices.
21. Which of these refer to a vapor recovery stage 1? - Correct answer.Delivery of gasoline and UST.
22. Which is not part of the hanging hardware? - Correct answer.Shear Valve