• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

CM 4211 Final Exam (Already Passed) with Questions Solved 100% Correct | Verified Solutions

Document preview thumbnail
Preview 2 out of 9 pages

CM 4211 Final Exam (Already Passed) with Questions Solved 100% Correct | Verified Solutions

Content preview

CM 4211 Final Exam (Already Passed) with
Questions Solved 100% Correct | Verified
Solutions

Which of the following should be considered unethical under all circumstances? -
✔✔A contractor lending its contractors license to a friend so he can get a subcontract.



Which of the following should be considered unethical under all circumstances? - ✔✔A
government rejecting all bids because it's representative wants the second low bidder to
be awarded the project.



Which of the following should be considered unethical under all circumstances? -
✔✔A contractor forward-pricing a change order using overtime amounts when the
contractor absolutely knows it can get additional crews at straight time.



Which of the following should be considered unethical under all circumstances? - ✔✔A
contractor remembering something weeks later that was not in the log book, and then
entering in the log book on the date it occurred.



All of the following statements are TRUE, except one. Which one? - ✔✔A
conditional agreement with an offer is an acceptance.



All of the following statements are TRUE, except one. Which one? - ✔✔Consideration
is always measured in money.

, All of the following statements are TRUE, except one. Which one? - ✔✔Most
contract breaches are of express conditions.



All of the following statements are TRUE, except one. Which one? - ✔✔The main advantage
to an owner of using a cost-plus-percentage fee arrangement is the incentive for the
contractor to hold down construction cost.



Only one of the following statements are TRUE. Which one? - ✔✔Liquidated damages are
an agreed-upon daily amount for finishing late.



All of the following statements are TRUE, except one. Which one? - ✔✔In a
guaranteed maximum price contract the contractor cannot lose money.



All of the following statements are TRUE, except one. Which one? - ✔✔The bid form itself
is drafted and completed by the owner.



All of the following statements are TRUE, except one. Which one? - ✔✔The changes
clause usually does not give the owner the unilateral right to make changes to the contract.



All of the following statements are TRUE, except one. Which one? - ✔✔If Physical
Conditions Reports are included in the bid documents, they can always be relied on by the
contractor even if there is a disclaimer in the contract made by the owner.



All of the following statements are TRUE, except one. Which one? - ✔✔The cost of
materials stored onsite, but not yet incorporated into the project will be owed by the owner to
the contractor even when there is provision in the contract documents to do so.



All of the following statements are TRUE, except one. Which one? - ✔✔An
"escalation" clause may be included in a short-term lump sum contract.

Document information

Uploaded on
November 26, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
114
Followers
5
Items
24387
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions