The first step in any major construction job.? - ANSWER Clearing and Leveling
Clearing the lot ensure.? - ANSWER That the various work crew will be able to
M
perform their job efficiently
O
Underground Service Alert.? - ANSWER A free service that provides damage
prevention services
A
What will the underground service alert review.? - ANSWER All excavation plans
and will send a crew to mark to mark the location of the underground utilities that are
N
entering the property
The underground service alert most be notified at least? - ANSWER At least 2 days
JP
but no earlier than 14 days before the excavation begins
Failing to notify Dig Alert before the excavation is subject to? - ANSWER A civil
penalty in the amount not to exceed $10,000
If the underground service alert is not notified due to negligence the penalty will be ? -
ANSWER Up to $10,000
,If the Underground Service Alert is intentionally not notified the penalty will be ? -
ANSWER Up to $50,000
Color code indentifiers "white".? - ANSWER Proposed excavation
Color code identifier "Red".? - ANSWER Electric power lines, cables, conduit and
lighting cables
Color code identifier "orange"? - ANSWER Communication, alarm or signal lines,
A
cables or conduit
VI
Color code identifier " purple". ? - ANSWER Reclaimed water line, irrigation and
slurry lines
TU
Color code identifier " pink"? - ANSWER Temporary survey markings
Color code identifier " yellow"? - ANSWER Gas, oil, steam, petroleum or gaseous
materials
IS
Color code identifier " blue".? - ANSWER Potable water
Color code identifier " green"? - ANSWER Sewers and drains
M
Facilities identifiers? CH - ANSWER Chemical
O
Facilities identifiers? E - ANSWER Electrical
A
Facilities identifiers? FO - ANSWER Fiber optic
N
Facilities identifiers? G - ANSWER Gas
Facilities identifiers? LPG - ANSWER Liquefied petroleum gas
JP
Facilities identifiers? PP - ANSWER Petroleum Products
Facilities identifiers?RR - ANSWER Railroad signals
Facilities identifiers? S - ANSWER Sewer
Facilities identifiers? SD - ANSWER Storm Drain
, Facilities identifiers?SS - ANSWER Storm Sewer
Facilities identifiers? SL - ANSWER Steer light
Facilities identifiers? STM - ANSWER Steam
Facilities identifiers? SP - ANSWER Slurry system
A
Facilities identifiers? TEL - ANSWER Telephone
VI
Facilities identifiers? TS - ANSWER Traffic signal
Facilities identifiers? TV - ANSWER Televisión
TU
Facilities identifiers? W - ANSWER Water or reclaimed water purple
Leveling the property will provide? - ANSWER A flat even surface for the building
IS
foundation
How is the property leveling done? - ANSWER Through excavation and filling or
other filler materials such as rocks and concrete
M
According to the California Building Code the filling Material must be compacted."? -
O
ANSWER To at least 90%
Why additional fill material is Recomended when when initially adding fill material? -
A
ANSWER To allow for compaction
N
Soil can be either? - ANSWER Granular or cohesive
Soils are generally classified into three types? - ANSWER Type A,B and C
JP
Type A soil? - ANSWER Is highly cohesive it holds the greatest amount of weight on
average 1.5 tons per square feet or more, it is the most stable type of soil, with most
clay based soils falling into this category
Type B Soil.? - ANSWER Include a mixture of cohesive and granular soil. The
smaller particles will stick together providing support to the larges particles it can handle
a medium amount of compression between 0.5 and 1.5 tons per square feet