4TH CLASS POWER ENGINEERING UNIT A11 CHAPTER 1 INTRODUCTION TO BOILERS QUESTIONS AND ANSWERS WITH SOLUTIONS 2024/25
Tubes used for high pressure boiler service are usually: Select one: a. welded b. rolled c. seamless d. beaded - ANSWER c This type of boiler is assembled piece by piece on the work site: Select one: a. field-assembled b. field-erected c. packaged d. auxiliary - ANSWER b A cylindrical pressure vessel component to which heads or matching components can be attached: Select one: a. downcomer b. riser c. flue d. course - ANSWER d In a pressure vessel, this is the plate that seals the end of a cylindrical shell or drum: Select
Written for
- Institution
- FOA CFOT Certification
- Course
- FOA CFOT Certification
Document information
- Uploaded on
- November 20, 2024
- Number of pages
- 6
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
4th class power engineering unit a11 chapter 1 int
Also available in package deal