When making a multiple crane lift it is important for the operator to understand that -
Answer-the weight may increase if the other crane lands the load first
If the crane's jib is offset 5 degrees as opposed to an original 15 degrees and the boom
angle remains constant you would expect the load radius to do what? - Answer-To be
reduced
When operating truck cranes what is the most unstable allowable quadrant of
operation? - Answer-Side
When working near power lines when is a signal person required? - Answer-When
crane moves within a booms length of power lines
How many broke wires in one strand in one lay of a wire rope slings will make it
necessary to replace the sling? - Answer-5
By order of strength which is correct - Answer-Basket, Vertical, Choker
Primary purpose for a roster sheave or auxiliary boom point sheave is to: - Answer-
Separate the hoist line
When the number of layers of rope on a drum increase the : - Answer-Allowable line pull
decreases
What is the minimum allowable distance from the crane and power lines under 50kV? -
Answer-10'
When determining the "gross load" the best method is: - Answer-Get an accurate load
weight and add the rigging
Eccentric main boom tip reeving casues - Answer-twisting of the boom
How many randomly broken wires must there be to remove a running wire rope from
service? - Answer-6
Tipping capacities of locomotive cranes are based on what % of tipping? - Answer-85%
Should the load be applied when determining the proper boom angle? - Answer-YES