CompTIA Project+ Practice Assessment Exam Questions and Answers.

Document preview thumbnail
Voorbeeld 3 van de 30 pagina's

CompTIAProject+PracticeAssessmentExam QuestionsandAnswers. A project manager reviews the notes from a previous project and discovers issues with community interactions. The project manager learns that the project improperly disposed of waste. What factors did the past project fail to impose? (Select all that apply.) Environmental Social Governance Current state - Environmental Social Governance An organization instructs a project manager to conduct a cost performance exercise on a project. The project manager calculates the cost variance of the project by referencing what other input? (Select all that apply.) Planned value Contingency reserve Earned value Actual cost - Earned val

Voorbeeld van de inhoud

CompTIA Project+ Practice Assessment Exam
Questions and Answers.

A project manager reviews the notes from a previous project and discovers issues with
community interactions. The project manager learns that the project improperly disposed
of waste. What factors did the past project fail to impose? (Select all that apply.)


Environmental
Social
Governance
Current state - Environmental
Social
Governance

An organization instructs a project manager to conduct a cost performance exercise on a
project. The project manager calculates the cost variance of the project by referencing
what other input? (Select all that apply.)


Planned value
Contingency reserve
Earned value
Actual cost - Earned value
Earned value (EV) is the actual schedule and is a point in time value. To calculate a cost
variance, actual cost is subtracted from earned value.


Actual cost
Actual cost (AC) is the actual cost and is a point in time value. The cost variance is earned
value less the actual cost.


A project manager assigns a team member to create a list of measurable quality targets.
Which quality-related function does the team member perform?


Quality assurance
Quality control
Quality standards

,Quality objectives - Quality objectives
Quality objectives are within a quality assurance plan by creating a list of measurable
quality targets. The project will have multiple quality targets. Examples of targets include
on-time delivery and the number of defects.


When practicing a waterfall project methodology, in which phase is a project team
member responsible for valid quality specifications?


Testing
Design
Requirements
Maintenance - Testing
In the waterfall testing phase, project team members verify that any work completed
meets the requirements and quality specifications.


A company posts an internal memo inviting team members to join a project. The post
states that participants will receive an additional 2% pay for any eligible project hours in
addition to the standard company hourly rate. The project manager calculates the pay
with which value while building a resource worksheet?


Resource cost rate
Unit of measure
Cost aggregation
Reserves - Unit of measure
A resource cost rate matches with some unit of measure (UOM). The UOM will vary by
resource type. Hourly is an example of a UOM.


A project manager looks at a resource management plan and realizes that the project
manager can do some phases of the resource lifecycle in parallel. Which phases does the
project manager review and take action on simultaneously? (Select all that apply.)


Retirement
Maintenance
Improvement
Acquisition - Maintenance
Improvement

, The improvement and maintenance phases run simultaneously for a single product.
Between acquiring and retiring a resource, the project manager cares for and improves it.


A project manager prepares a new project's work breakdown structure (WBS). The project
manager creates a branch for certain tasks and then ends the branch with a final outcome.
When drafting the WBS, what terminology does the project manager assign to the
outcome? (Select all that apply.)


Element
Level
Work package
Leg - Element
Work package
Elements are the deliverables in a work breakdown structure (WBS). It is each box in a
chart and each row in a table. The WBS element is short, at just two or three words.


The work package element is the lowest in each branch or leg; an element without a child
element is a work package. Known as a "terminal element," a work package estimates
costs, resources, and timing.


A seasoned project manager prefers to manage projects in a linear and sequential
fashion. Which framework does the project manager use?


Waterfall
Agile
Kanban
Scrum - Waterfall
The waterfall is a linear, sequential project management framework. All work gets
completed in one phase before another phase starts. Work only flows one way in the
waterfall.


A seasoned project manager requires all team members to be available for a weekly
meeting. Participants are required to be present as the meeting occurs in real-time.
Following the meeting, a staff member will use a designated communication channel to
distribute meeting minutes. What communication methods are used in this scenario?
(Select all that apply.)


Synchronous

Documentinformatie

Geüpload op
14 november 2024
Aantal pagina's
30
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$18.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Onlineexam
4.2
(77)
Verkocht
461
Volgers
352
Items
14898
Laatst verkocht
1 maand geleden


Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen