July 1 2005, service techs shall possess or work under someone who has a current certification indicating
he or she has passed the ? - ** VERIFIED ANSWERS **✔✔California UST service technician exam
ICC cert must be renewed every? - ** VERIFIED ANSWERS **✔✔24 months
Service techs must posses or be employed by a person who has the appropriate contractors license
unless? - ** VERIFIED ANSWERS **✔✔The individual has a Tank testing licens
Service tech is defined by any individual who? - ** VERIFIED ANSWERS **✔✔Test UST monitoring
equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? - ** VERIFIED ANSWERS
**✔✔Approve comparable alternat training .
UST includes? - ** VERIFIED ANSWERS **✔✔Tank and connected piping
What is considered and UST - ** VERIFIED ANSWERS **✔✔petroleum storage tank
What UST system meets the requirements for secondary containment? - ** VERIFIED ANSWERS
**✔✔Doubled wall tanks
According to title 23; the following piping components if installed after July 1 1987 must have secondary
containment - ** VERIFIED ANSWERS **✔✔Pressured product piping
, Considered "pipe" on tanks installed after July 1 2003 - ** VERIFIED ANSWERS **✔✔Pressured product
piping and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems by - ** VERIFIED ANSWERS
**✔✔December 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck - ** VERIFIED
ANSWERS **✔✔Stage 1 vapor recovery
An approved method for non visual monitoring for existing UST systems. - ** VERIFIED ANSWERS
**✔✔Statistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of ? - ** VERIFIED ANSWERS **✔✔.2 gallons per hour
Manual inventory reconciliation. - ** VERIFIED ANSWERS **✔✔No longer an approved method for non
visual monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with secondary containment shall be
capable of tetecting a leak of ? - ** VERIFIED ANSWERS **✔✔3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? - ** VERIFIED ANSWERS **✔✔At least monthly
According to PEI RP 300 a combustible gas can be used to ? - ** VERIFIED ANSWERS **✔✔Detect vapor
leaks in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should include? - **
VERIFIED ANSWERS **✔✔Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? -
** VERIFIED ANSWERS **✔✔95% full
questions with answers
July 1 2005, service techs shall possess or work under someone who has a current certification indicating
he or she has passed the ? - ** VERIFIED ANSWERS **✔✔California UST service technician exam
ICC cert must be renewed every? - ** VERIFIED ANSWERS **✔✔24 months
Service techs must posses or be employed by a person who has the appropriate contractors license
unless? - ** VERIFIED ANSWERS **✔✔The individual has a Tank testing licens
Service tech is defined by any individual who? - ** VERIFIED ANSWERS **✔✔Test UST monitoring
equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? - ** VERIFIED ANSWERS
**✔✔Approve comparable alternat training .
UST includes? - ** VERIFIED ANSWERS **✔✔Tank and connected piping
What is considered and UST - ** VERIFIED ANSWERS **✔✔petroleum storage tank
What UST system meets the requirements for secondary containment? - ** VERIFIED ANSWERS
**✔✔Doubled wall tanks
According to title 23; the following piping components if installed after July 1 1987 must have secondary
containment - ** VERIFIED ANSWERS **✔✔Pressured product piping
, Considered "pipe" on tanks installed after July 1 2003 - ** VERIFIED ANSWERS **✔✔Pressured product
piping and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems by - ** VERIFIED ANSWERS
**✔✔December 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck - ** VERIFIED
ANSWERS **✔✔Stage 1 vapor recovery
An approved method for non visual monitoring for existing UST systems. - ** VERIFIED ANSWERS
**✔✔Statistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of ? - ** VERIFIED ANSWERS **✔✔.2 gallons per hour
Manual inventory reconciliation. - ** VERIFIED ANSWERS **✔✔No longer an approved method for non
visual monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with secondary containment shall be
capable of tetecting a leak of ? - ** VERIFIED ANSWERS **✔✔3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? - ** VERIFIED ANSWERS **✔✔At least monthly
According to PEI RP 300 a combustible gas can be used to ? - ** VERIFIED ANSWERS **✔✔Detect vapor
leaks in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should include? - **
VERIFIED ANSWERS **✔✔Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? -
** VERIFIED ANSWERS **✔✔95% full