UPDATED ,ALL ANSWERS 100% CORRECT VERIFIED BEST EXAM SOLUTION
GRADED A+ FOR SUCCESS.
which of the following lists contains only typical exit criteria from testing?
a) reliability measures, test coverage schedule and status about fixing defect and remaining
risks
b) reliability measures, test coverage, degree of testers Independence and products
completeness
c) reliability measures, test coverage, test cost, availability of test environment, time to
market and product completeness
d) time to market, remaining defects, tester qualification, availability of testable use cases,
test coverage and test cost - CORRECT ANSWERS A
which of the following is not included in a test summary report?
a) defining pass/fail criteria and objectives of testing
b) deviations from the test approach
c) measurements of actual progress against exit criteria
d) evaluation of the quality of the test object - CORRECT ANSWERS A
the project develops a smart heating thermostat. the control algorithms of thermostat were
modeled as Matlab/Simulink models and run on the Internet connected server. The
thermostat uses the specifications of the server to trigger the heating valves.
The test manager has defined the following test strategy/approach in the test plan
1. the acceptance test for the whole system is executed as an experienced-based test
2. the control algorithms on the server are checked against standard of the energy saving
regulation
3. the functional test of the thermostat is performed as risk-based testing
4. the security tests of data/communication via the Internet are executed together with
external security experts
what four common types of test strategies/approaches did the test manager implement in
the test plan?
, ISTQB FOUNDATION LEVEL TEST QUESTIONS AND ANSWERS 2023/2024
UPDATED ,ALL ANSWERS 100% CORRECT VERIFIED BEST EXAM SOLUTION
GRADED A+ FOR SUCCESS.
a) methodical, analytical, reactive and regression-averse
b) analytical, standard-compliant, consultative and reac - CORRECT ANSWERS B
which one of the following is the characteristic of a metrics-based approach for test
estimation?
a) budget which was used by a previous similar test project
b) overall experience collected in interviews with test managers
c) estimation of effort for test automation agreed in the test team
d) average of calculations collected from business - CORRECT ANSWERS A
37 diagram - CORRECT ANSWERS C
list 38 - CORRECT ANSWERS B
which of the following is most likely to be a benefit of test execution tools?
a) it is easy to create regression tests
b) it is easy to maintain version control of test assets
c) it is easy to design tests for security testing
d) it is easy to run regression tests - CORRECT ANSWERS D
which one of the following test tools is mostly suitable for developers rather than testers?
a) requirement management tools
b) configuration management tools
c) defect management tools
d) performance testing tools - CORRECT ANSWERS C