FDOT ASPHALT PAVING LEVEL 1
EXAM ACTUAL EXAM QUESTIONS
WITH DETAILED VERIFIED
ANSWERS (100% CORRECT
ANSWERS) /ALREADY GRADED A+
After placing the simple level on the pavement then
you - ....ANSWER...Raise the down end of the level
until it is level (bubble center)
After the simple level is lifted until it is level you
measure what - ....ANSWER...The length of the
simple level and the height between the (previously
down) end of the level to the pavement
Formula to calculate the manual cross slope -
....ANSWER...Calculate the slope using the formula
( h / l ) x 100 = slope %
, Requirements for the rolling Straightedge -
....ANSWER...Must have a read out gauge, kept clean
and in working order, low and high reading, and
marks to the nearest 1/16 (1mm)
Rolling Straightedge pulled at - ....ANSWER...3 to
5mph or less
Deficiencies pointed out with rolling straightedge
you should first - ....ANSWER...Mark the pavement at
the center wheel where the needle initially shows a
deficiency and where is ends. Also record location
and measurements of deficiency.
Core sampling is used for - ....ANSWER...testing
density
and permeability
Core sampling equipment - ....ANSWER...Concrete
saw
Diamond bit core drill
Size of core depends on test
Ice chest (Optional)
Ice (Optional)
EXAM ACTUAL EXAM QUESTIONS
WITH DETAILED VERIFIED
ANSWERS (100% CORRECT
ANSWERS) /ALREADY GRADED A+
After placing the simple level on the pavement then
you - ....ANSWER...Raise the down end of the level
until it is level (bubble center)
After the simple level is lifted until it is level you
measure what - ....ANSWER...The length of the
simple level and the height between the (previously
down) end of the level to the pavement
Formula to calculate the manual cross slope -
....ANSWER...Calculate the slope using the formula
( h / l ) x 100 = slope %
, Requirements for the rolling Straightedge -
....ANSWER...Must have a read out gauge, kept clean
and in working order, low and high reading, and
marks to the nearest 1/16 (1mm)
Rolling Straightedge pulled at - ....ANSWER...3 to
5mph or less
Deficiencies pointed out with rolling straightedge
you should first - ....ANSWER...Mark the pavement at
the center wheel where the needle initially shows a
deficiency and where is ends. Also record location
and measurements of deficiency.
Core sampling is used for - ....ANSWER...testing
density
and permeability
Core sampling equipment - ....ANSWER...Concrete
saw
Diamond bit core drill
Size of core depends on test
Ice chest (Optional)
Ice (Optional)