The contractor quality control organization: - ANSWER May vary in size depending on
the work being performed at a point in time.
A definable feature of work: - ANSWER Can consists of a combination of multiple
specification sections depending upon the nature of the work
An effective CQC program will: - ANSWER Be an incentive for work to be done correctly
the first time resulting in earlier completion, reduced field overhead costs, and greater
profits
The means for the government to enforce contract compliance are provided in the: -
ANSWER *Contract Clauses of the contract.*
If the Contractor does not provide an adequate superintendent, the Contracting Officer
may, under the contract, - ANSWER *Require the contractor to assume personal
supervision of the work.*
If initial review of the quality control plan shows it to be unacceptable: - ANSWER The
contractor corrects the plan, addressing the government comments, prior to
resubmission
The Quality Control Plan - ANSWER Is the basis upon which quality work is founded and
describes intended quality control processes.
If there is a dispute as to whether the contractor's work conforms to the contract: -
ANSWER The government decides
, Actual construction on the job site commences: - ANSWER After an interim or final QC
Plan is approved.
Construction Quality Management is the implementation of activities, which provide
confidence that construction will be carried out. - ANSWER In accordance with plans
and specifications, on schedule, within a defined budget and an environment, which is
safe to work in.
A cumulative list of job deficiencies/rework items could be found in: - ANSWER A
deficiency tracking system/reworks items list, which is generally maintained within
RMS.
Inspection is: - ANSWER *The process of after-the-fact examination of ongoing and
completed work.*
It is the responsibility of Quality assurance Personnel to: - ANSWER Periodically verify
that the contractor's system of control is working effectively.
The ______ consists of daily checks of the work to assure continuing compliance with
contract requirements - ANSWER Follow-up phase
Design-Build contracts require: - ANSWER *The QC Manager to be in place and take an
active role in the review and coordination of the design*
Which of the following is included in all three phases of the Three Phases of Control -
ANSWER Safety
Construction Quality Management is to - ANSWER *Achieve the quality established by
properly developed requirements through the combined responsibility, but separate,
efforts of contractor and Government personnel*
Testing is very crucial in Construction Quality Management and is conducted by -
ANSWER Both the contractor and the Government
Graded 100% Solved Correctly
The contractor quality control organization: - ANSWER May vary in size depending on
the work being performed at a point in time.
A definable feature of work: - ANSWER Can consists of a combination of multiple
specification sections depending upon the nature of the work
An effective CQC program will: - ANSWER Be an incentive for work to be done correctly
the first time resulting in earlier completion, reduced field overhead costs, and greater
profits
The means for the government to enforce contract compliance are provided in the: -
ANSWER *Contract Clauses of the contract.*
If the Contractor does not provide an adequate superintendent, the Contracting Officer
may, under the contract, - ANSWER *Require the contractor to assume personal
supervision of the work.*
If initial review of the quality control plan shows it to be unacceptable: - ANSWER The
contractor corrects the plan, addressing the government comments, prior to
resubmission
The Quality Control Plan - ANSWER Is the basis upon which quality work is founded and
describes intended quality control processes.
If there is a dispute as to whether the contractor's work conforms to the contract: -
ANSWER The government decides
, Actual construction on the job site commences: - ANSWER After an interim or final QC
Plan is approved.
Construction Quality Management is the implementation of activities, which provide
confidence that construction will be carried out. - ANSWER In accordance with plans
and specifications, on schedule, within a defined budget and an environment, which is
safe to work in.
A cumulative list of job deficiencies/rework items could be found in: - ANSWER A
deficiency tracking system/reworks items list, which is generally maintained within
RMS.
Inspection is: - ANSWER *The process of after-the-fact examination of ongoing and
completed work.*
It is the responsibility of Quality assurance Personnel to: - ANSWER Periodically verify
that the contractor's system of control is working effectively.
The ______ consists of daily checks of the work to assure continuing compliance with
contract requirements - ANSWER Follow-up phase
Design-Build contracts require: - ANSWER *The QC Manager to be in place and take an
active role in the review and coordination of the design*
Which of the following is included in all three phases of the Three Phases of Control -
ANSWER Safety
Construction Quality Management is to - ANSWER *Achieve the quality established by
properly developed requirements through the combined responsibility, but separate,
efforts of contractor and Government personnel*
Testing is very crucial in Construction Quality Management and is conducted by -
ANSWER Both the contractor and the Government