• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Swppp Study Guide Set With All Solutions Offered.

Document preview thumbnail
Preview 2 out of 9 pages

SWPPP STUDY GUIDE SET WITH ALL SOLUTIONS OFFERED.

Content preview

SWPPP STUDY GUIDE SET WITH ALL
SOLUTIONS OFFERED




Clean Water Act - correct answer-Law set into place in 1970 for storm water
b b b bb b b b b b b b b b


regulation
b




NPDES - correct answer-Regulations for monitoring storm water activity on a
b bb b b b b b b b b


construction site, are outlined in
b b b b b




Immediately after project is awarded and before you begin any site work - correct
b b b b b b b b b b b b bb


banswer-When should you read and understand SWPP b b b b b b




Contaminated ground water - correct answer-What is not an allowable storm water
b b b bb b b b b b b b


discharge or non-storm water discharge
b b b b b




When jurisdiction of operations specifies you can start - correct answer-When may
b b b b b b b b bb b b


construction activity begin
b b b




303D list - correct answer-Waters that fail anti-degradation list are placed on which
b b bb b b b b b b b b b


list.
b




An officer and project owner - correct answer-SWPPPs certification are signed by
b b b b b bb b b b b b


who
b




FALSE - correct answer-The document that must be completed signed and
b bb b b b b b b b b


submitted to the state to obtain authorization to discharge is the NOT. (T/F)
b b b b b b b b b b b b b




All construction has been completed both inside and outside - correct answer-NOT
b b b b b b b b b bb b


can be filed when
b b b b




is in charge of daily activities - correct answer-Operations on a construction site are
b b b b b b bb b b b b b b


bthe entity in charge of plans and specification and the entity who?
b b b b b b b b b b b

, Stay out of trouble with the law - correct answer-Motives for staying in compliance
b b b b b b b bb b b b b b


with storm water objectives?
b b b b




To protect and preserve beneficial use of U.S. waters, maintaining their clean,
b b b b b b b b b b b


physical and biological integrity - correct answer-Objectives of the clean water act
b b b b b bb b b b b b b


are
b




National Pollutant Discharge Elimination System - correct answer-NPDES stands for
b b b b b bb b b b




Site description and maps, inspection and maintenance procedure. Potential
b b b b b b b b


pollutant sources, schedules of activities, site contact information, plan certification
b b b b b b b b b b


documents, site contact info and descriptions of controls BMP - correct answer-
b b b b b b b b b b bb b


Which are a component of a good SWPPP
b b b b b b b




False - correct answer-Construction sediment is not considered a potential pollutant
b bb b b b b b b b b


source (T/F)
b b




Project owner, SWPPP designer - correct answer-When modifying or substituting a
b b b b bb b b b b b


storm water BMP the contractor must consult with
b b b b b b b b




False - correct answer-NOI must be submitted to the appropriate agency before the
b bb b b b b b b b b b b


storm water pollution preventive plan is developed (T/F)
b b b b b b b b




False, 303d List - correct answer-Name of the list with impaired waters is called
b b b bb b b b b b b b b b


totally daily maximum load (T/F)
b b b b b




It is required by law, it documents storm water management activity on your site, and
b b b b b b b b b b b b b b


bit demonstrates your intent to manage storm water on your site - correct answer-
b b b b b b b b b b b bb b


You should have a SWPPP for your construction site because?
b b b b b b b b b




Site specific - correct answer-A well constructed SWPPP for your site should be?
b b bb b b b b b b b b b




Prior to commencing construction - correct answer-The NOI must be submitted
b b b b bb b b b b b


when?
b




Schedule of activities - correct answer-One necessary component of a good
b b b bb b b b b b b


SWPPP is?
b b




Weather and Climate - correct answer-Factors that may impact SWPPP scheduling
b b b bb b b b b b b


activities include
b b




masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
b b b b b b b b b b b


correct answer-Pollutant sources on a construction may include
b b b b b b b b




Seek written approval of the project SWPPP designer or project owner - correct
b b b b b b b b b b b bb


answer-If you believe BMP modification are necessary to the site you must?
b b b b b b b b b b b b




Endangered species and historical preservation - correct answer-The following
b b b b b bb b b


consideration may be incorporated into the SWPPP?
b b b b b b b

Document information

Uploaded on
November 5, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edufiles
4.8
(218)
Sold
149
Followers
10
Items
7460
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions