ICC / UST (2024-2025) QUESTIONS WITH ANSWERS.
Any person who intentionally tampers with LLD shall be
punished with fines no less than $______. -
<<<Answers>>>>$5000
CA law requires USTs be inspected every_____ -
<<<Answers>>>>1 year
Monitoring records must be kept on file for ____ -
<<<Answers>>>>3 years
Cathodic protection maintenance records must be kept on file
for ______ - <<<Answers>>>>6.5 years
Unauthorized release must be notified to local agency within
_____ followed by written notification within ______. -
<<<Answers>>>>24 hours
5 days
By December 22 1998, all automatic line leak detectors
installed on SW pressurized piping must be capable of: -
<<<Answers>>>>Shutting down the piping system
During temporary closure, the following openings must be
sealed: - <<<Answers>>>>fill and access
, ICC / UST (2024-2025) QUESTIONS WITH ANSWERS.
Pressurized product piping with secondary containment
subject to annual pressure test must be tested with method
capable of detecting: - <<<Answers>>>>.1 gph
Written performance claims on release detection systems must
be kept on file for ______ - <<<Answers>>>>5 years
Underground storage tank system includes: -
<<<Answers>>>>UST, piping, storage of hazardous
substance
For existing UST with ATG as sole means of quantitative
release detection, the ATG must be capable of _____ gallons
per hour - <<<Answers>>>>0.2 gph
Designated operator must provide training to employees
_____how often? - <<<Answers>>>>Annually
Corrosion Specialist - <<<Answers>>>>designs and certifies
cathodic protection system
Secondary containment shall be constructed to contain at least
the following volumes: - <<<Answers>>>>A. 100% of usable
capacity of primary where there is only one primary is within
the secondary
B. 150% of the largest container if there are multiple primary
containers in a single secondary
Any person who intentionally tampers with LLD shall be
punished with fines no less than $______. -
<<<Answers>>>>$5000
CA law requires USTs be inspected every_____ -
<<<Answers>>>>1 year
Monitoring records must be kept on file for ____ -
<<<Answers>>>>3 years
Cathodic protection maintenance records must be kept on file
for ______ - <<<Answers>>>>6.5 years
Unauthorized release must be notified to local agency within
_____ followed by written notification within ______. -
<<<Answers>>>>24 hours
5 days
By December 22 1998, all automatic line leak detectors
installed on SW pressurized piping must be capable of: -
<<<Answers>>>>Shutting down the piping system
During temporary closure, the following openings must be
sealed: - <<<Answers>>>>fill and access
, ICC / UST (2024-2025) QUESTIONS WITH ANSWERS.
Pressurized product piping with secondary containment
subject to annual pressure test must be tested with method
capable of detecting: - <<<Answers>>>>.1 gph
Written performance claims on release detection systems must
be kept on file for ______ - <<<Answers>>>>5 years
Underground storage tank system includes: -
<<<Answers>>>>UST, piping, storage of hazardous
substance
For existing UST with ATG as sole means of quantitative
release detection, the ATG must be capable of _____ gallons
per hour - <<<Answers>>>>0.2 gph
Designated operator must provide training to employees
_____how often? - <<<Answers>>>>Annually
Corrosion Specialist - <<<Answers>>>>designs and certifies
cathodic protection system
Secondary containment shall be constructed to contain at least
the following volumes: - <<<Answers>>>>A. 100% of usable
capacity of primary where there is only one primary is within
the secondary
B. 150% of the largest container if there are multiple primary
containers in a single secondary