100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Concrete Batch Plant Operator Exam(FDOT) TEST QUESTIONS AND ANSWERS VERIFIED LATEST UPDATE

Puntuación
-
Vendido
-
Páginas
4
Grado
A+
Subido en
04-11-2024
Escrito en
2024/2025

Concrete Batch Plant Operator Exam(FDOT) TEST QUESTIONS AND ANSWERS VERIFIED LATEST UPDATE Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - Answer- Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? - Answer- 24 Free moisture of the aggregate means: - Answer- Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate. If the moister test is done other than by the cook-out method, how often shall the other methods be verified? - Answer- Each week For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answer- 33 thru 37% In concrete, which material has a specific gravity of one? - Answer- Water

Mostrar más Leer menos
Institución
Concrete Batch Plant Operator
Grado
Concrete Batch Plant Operator








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Concrete Batch Plant Operator
Grado
Concrete Batch Plant Operator

Información del documento

Subido en
4 de noviembre de 2024
Número de páginas
4
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Concrete Batch Plant Operator Exam(FDOT)
TEST QUESTIONS AND ANSWERS VERIFIED
LATEST UPDATE
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: -
Answer- Minimize Free Water Content

Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch
for FDOT? - Answer- 24

Free moisture of the aggregate means: - Answer- Moister on the surface of an
aggregate that is above and beyond the absorbed moister in the aggregate.

If the moister test is done other than by the cook-out method, how often shall the other
methods be verified? - Answer- Each week

For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answer-
33 thru 37%

In concrete, which material has a specific gravity of one? - Answer- Water

What is the air content range for all classes of structural concrete except Class IV
Shaft? - Answer- 1.00 thru 6.00%

When can unmetered water be added to the concrete? - Answer- Not at all.

Do not allow the total number of revolution at mixing speed to exceed: - Answer- 160
Revolutions

After all materials have been charged into the transit mixer drum, the concrete must be
mixed at how many revolutions at the plant before leaving for the project? - Answer- 70
to 100

When the water meters / scales are calibrated, prior to production, at what frequency
should they be checked there after? - Answer- 3 moths

To what accuracy should the scales for weighing cement , pozzolan, slag and
aggregates at the plant be maintained - Answer- 0.5% of maximum load normally
handled

For concrete containing a water-reducing retarding admixture, in an agitator truck, the
maximum time for depositing the concrete shall not exceed: - Answer- 90 minutes
$10.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ApassExams Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
29
Miembro desde
2 año
Número de seguidores
10
Documentos
1710
Última venta
4 meses hace
Nursing Perfection Study Station

Just For You...Yes You....EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology, Nursing, Human resource Management and Mathematics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why I'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work

3.0

2 reseñas

5
1
4
0
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes