Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

P99 (LOW PSI BURNER OPERATOR) TEST WITH VERIFIED SOLUTIONS

Document preview thumbnail
Preview 2 out of 9 pages

P99 (LOW PSI BURNER OPERATOR) TEST WITH VERIFIED SOLUTIONS

Content preview

P99 (LOW PSI BURNER OPERATOR) TEST WITH VERIFIED SOLUTIONS




1.: Every oil burning installation that is not fully automatic or
hh hh hh hh hh hh hh hh hh hh


requires preheating shall be operated by, or under the direct
hh hh hh hh hh hh hh hh hh hh


supervision of a person holding a certificate of fitness issued by the
hh hh hh hh hh hh hh hh hh hh hh hh


fire commissioner. Such person shall be in the building at all times
hh hh hh hh hh hh hh hh hh hh hh hh


while the burners are in operation, and shall be present in the
hh hh hh hh hh hh hh hh hh hh hh hh


boiler room during the starting of the operation of a boiler.
hh hh hh hh hh hh hh hh hh hh hh


2.Low temperature equipment: Low temperature equipment whose
hh hh hh hh hh hh


products of combustion at the point of leaving the equipment have
hh hh hh hh hh hh hh hh hh hh hh


a temperature of 600 F or less under normal condition.
hh hh hh hh hh hh hh hh hh hh


3.Medium temperature equipment: Medium temperature equipment
hh hh hh hh hh


whose prod- ucts of combustion at the point of leaving the equipment
hh hh hh hh hh hh hh hh hh hh hh hh


have a temperature between 600 and 1000 F under normal
hh hh hh hh hh hh hh hh hh hh


operation
hh


4.: High temperature equipment whose product of combustion at the
hh hh hh hh hh hh hh hh hh


point of leaving the equipment have a temperature of 1000F or
hh hh hh hh hh hh hh hh hh hh hh


greater under normal operation conditions
hh hh hh hh hh


5.: Ventilation shall be capable of providing at least thirty six CFM
hh hh hh hh hh hh hh hh hh hh hh


of air for each gallon of oil per hour required to fire the equipment
hh hh hh hh hh hh hh hh hh hh hh hh hh hh


to gross output. If ventilation for combustion is supplied
hh hh hh hh hh hh hh hh hh


mechanically, the ventilation system shall be electrically interlocked
hh hh hh hh hh hh hh hh


with the burner so that when the burner is in operation, the
hh hh hh hh hh hh hh hh hh hh hh hh


ventilating system shall maintain the room in which the equipment
hh hh hh hh hh hh hh hh hh hh


is located at a pressure no less than the outdoors atmospheric
hh hh hh hh hh hh hh hh hh hh hh


pressure. Flue dampers. Dampers in flues shall be constructed so
hh hh hh hh hh hh hh hh hh hh


that they cannot completely cut off the passage of flue gasses at
hh hh hh hh hh hh hh hh hh hh hh hh


any time. Tight closing dampers may be installed with approved
hh hh hh hh hh hh hh hh hh hh


automatic draft and combustion controls.
hh hh hh hh hh



1 hh/
hh9

, P99 (LOW PSI BURNER OPERATOR) TEST WITH VERIFIED SOLUTIONS

6.: Fuel Oil equipment shall mean hydrocarbon oils with a flashpoint
hh hh hh hh hh hh hh hh hh hh


not lower than 100F
hh hh hh hh


7.: The use of crankcase reuse oil as fuel oil is prohibited.
hh hh hh hh hh hh hh hh hh hh hh


8.: Installation of piping and tubing. Overflow pipes, where
hh hh hh hh hh hh hh hh


installed, shall not be smaller in size than the supply pipe.
hh hh hh hh hh hh hh hh hh hh hh


9.: Where a shut off valve is installed in the discharge line from an oil
hh hh hh hh hh hh hh hh hh hh hh hh hh hh


pump, a relief valve shall be installed in the discharge line between
hh hh hh hh hh hh hh hh hh hh hh hh


the pump and the first shut off valve. A relief or pressure regulating
hh hh hh hh hh hh hh hh hh hh hh hh hh


valve shall be provided in the oil piping system on the heater side
hh hh hh hh hh hh hh hh hh hh hh hh hh


of the shut off valves.
hh hh hh hh hh


10.: Heating coils in storage tanks. The heating of oil in storage
hh hh hh hh hh hh hh hh hh hh hh


tanks shall be by means of coils using low pressure hot water or
hh hh hh hh hh hh hh hh hh hh hh hh hh


steam, or by means of electric heater approved for use in oil
hh hh hh hh hh hh hh hh hh hh hh hh


storage tanks.
hh hh


11.: Where a single tank and a single burner are installed, a shut off
hh hh hh hh hh hh hh hh hh hh hh hh hh


valve shall be required in the supply line at the tank and another
hh hh hh hh hh hh hh hh hh hh hh hh hh


at the burner.
hh hh hh




2 hh/
hh9

Document information

Uploaded on
November 3, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Edufiles
4.9
(215)
Sold
140
Followers
10
Items
7531
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions