Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

ICC / UST EXAM QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 2 out of 6 pages

ICC / UST EXAM QUESTIONS AND ANSWERS

Content preview

ICC / UST EXAM QUESTIONS AND ANSWERS
spill prevention equipment consists of a spill bucket that is intended for.... - Answers-
Catching product when transfer hose is detached.

Which statement regarding manual inventory reconciliation is true..... - Answers- it is no
longer an approved method of non-visual monitoring of existing UST systems.

An approved method of leak detection for an underground pressurized piping system
includes... - Answers- A device that automatically restricts product flow through piping.

Under Dispenser Containment was required for all UST systems by - Answers-
12/31/2003

Tanks without secondary containment located within______of a public drinking water
well require recurrent enhanced leak detection testing - Answers- 1,000 Feet

The term Ullage means - Answers- The space or volume above the level of motor
vehicle fuel in a tank or tank system

During a monitor system certification all of the following must be inspected except -
Answers- Fire extinguisher location

When an electrically conductive object is grounded, the electric potential is - Answers-
zero

A_____is installed on the vent riser to prevent vapors from escaping or entering the
system, unless a pressure or vacuum condition exists that exceeds that design opening
pressure or vacuum limit of the cap - Answers- P/V Cap

According to the health and safety code, Tanks installed after July 1, 2003 require a one
time test at installation to determine that the tank is product tight. acceptable methods
are - Answers- inert gas pressure test

Spell containment devices must be attested no less than ________ To demonstrate that
it is capable Of containing the hazardous substance until it is detected in cleaned-up -
Answers- Annually

Spill containment structure or spill bucket is required at the - Answers- fill

Given a monitoring system certification is being conducted on a ust System with double-
wall tank and single walled pressurized piping a positive shut off device is used for
overfill protection to complete the monitoring system certification the service technician
must functionally test all of the following components except the - Answers- Automatic
tank gauge

, All of the following must be included VST monitor system certification except the -
Answers- fuctionality of flapper were ball

According to the ccr title 23 UST regulations a monitoring equipment certification must
be documented using a - Answers- Monitoring system certification form

Emergency shutoff valve or shear valves Shall be installed at what location - Answers-
At-grade level of dispenser device

Spell containers may be constructed of metal - Answers- Exterior wall is protected from
Galvanic corrosion

If no manufacturer training is available a service technician can service the leak
detection can only when - Answers- Approved by the local agency

Tanks without secondary containment located within a specific distance of a public
drinking water Well require enhanced leak detection testing - Answers- Every three
years

All of the following licenses allow An individual to perform a secondary containment
Testing except - Answers- C10 electrical contractor

By December 22nd 1998 all automatic line leak detectors installed on single walled
pressurized piping must be capable of - Answers- Restricting product flow

When removing a liquid from containment areas and the liquid contains fuel you should
- Answers- Handle it as hazardous waste

According to ccr title 23UST regulations a spell container must have a minimum
capacity of what gallons - Answers- Five gallons

According to CCR title 23UST regulations what is the frequency the monitor certification
must be performed - Answers- Every 12 months or annually

Visual monitoring is utilized as the means of release detection or a single wall tank be
conducted on a what basis - Answers- Daily

Purpose of spill and overfill protection equipment is to minimize the potential for a
release during - Answers- fuel deliveries

Which of the following is a potential Symptom of toxic petroleum exposure - Answers-
Dizziness
Tremors
eye irritation
All the above

Document information

Uploaded on
November 3, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(360)
Sold
2133
Followers
1447
Items
58268
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions