Building Analysis Professional Exam Review
ANSI BPI Standard
According to ANSI/BPI 1200 standard which one of the following unvented heating
would need to be removed from service? - Answer the 15,000 btu/hr. from the bedroom
review the standard
A natural draft furnace is back drafting regardless of the caz door position. and air
handler operation. - Answer According to ansi/bpi1200 standard. have a qualified
professional evalute it. BPI standed p.41
Review picture of air conditioner, what is the nominal rating for this unit? And if the work
order called 3 ton and was the installed is this an issues - Answer Rember 12,00 btu = 1
ton, 2 ton system, look at model number, incremented of 12 "24" in model number
24,000btu/hr. or 2 tons of coolings. yes, it would be undersized.
A client gets their utilities bills for the year. What is the annual heating load in terms for
the heating season from Oct 1st - May 31st? Answer Look at graph and calculate months
Savings to investment picture - look at picture graph an identify which window is label
incorrect (window replacement SIR 4.5)
Energy Model software - Computer model created in order to test or validate the
thermal/energy performance of the building; especially the facade and mechanical
systems .Calculates return on investments
what would have happened if the orientation was inputted wrong into the energy
modelling software. - Answer the orientation of the software would affect the ROI
If the input on the walls was 20% less than actual wall? Calculation on ROI for cellulose
, wall insulation would be affected.
What set points would not be monitored for energy consumption? Humidity control
settings.
How to calibrate the energy model software? Input 1 year of energy bills.
Air conditioning installation should match the projected load of the home or dwelling. -
Answer do not install what you have taken out.
RMS - Answer is a book used to eistamate labor and materials
spay foam (polyurethane) - Answer an ignition barrier is a material used with foam
insulation to prevent the foam from igniting.
Ventilation - Answer calculate using formula.
ventilation purpose - Answer is to dilute indoor air pollutants
occupied floor area is applied to determine? -Answer the ventilation requirements
in case the buildings air flow is less than the minimum air ventilation requirements
-Answer mechanical ventilation must be provided.
if knob-and-tube wiring exists in the attic? -Answer document in the work order as a
hazard
decommission knob and tube prior to? -Answer the installation of insulation
Situation permitting the electrican my select one of these two options for knob and tube,
ANSI BPI Standard
According to ANSI/BPI 1200 standard which one of the following unvented heating
would need to be removed from service? - Answer the 15,000 btu/hr. from the bedroom
review the standard
A natural draft furnace is back drafting regardless of the caz door position. and air
handler operation. - Answer According to ansi/bpi1200 standard. have a qualified
professional evalute it. BPI standed p.41
Review picture of air conditioner, what is the nominal rating for this unit? And if the work
order called 3 ton and was the installed is this an issues - Answer Rember 12,00 btu = 1
ton, 2 ton system, look at model number, incremented of 12 "24" in model number
24,000btu/hr. or 2 tons of coolings. yes, it would be undersized.
A client gets their utilities bills for the year. What is the annual heating load in terms for
the heating season from Oct 1st - May 31st? Answer Look at graph and calculate months
Savings to investment picture - look at picture graph an identify which window is label
incorrect (window replacement SIR 4.5)
Energy Model software - Computer model created in order to test or validate the
thermal/energy performance of the building; especially the facade and mechanical
systems .Calculates return on investments
what would have happened if the orientation was inputted wrong into the energy
modelling software. - Answer the orientation of the software would affect the ROI
If the input on the walls was 20% less than actual wall? Calculation on ROI for cellulose
, wall insulation would be affected.
What set points would not be monitored for energy consumption? Humidity control
settings.
How to calibrate the energy model software? Input 1 year of energy bills.
Air conditioning installation should match the projected load of the home or dwelling. -
Answer do not install what you have taken out.
RMS - Answer is a book used to eistamate labor and materials
spay foam (polyurethane) - Answer an ignition barrier is a material used with foam
insulation to prevent the foam from igniting.
Ventilation - Answer calculate using formula.
ventilation purpose - Answer is to dilute indoor air pollutants
occupied floor area is applied to determine? -Answer the ventilation requirements
in case the buildings air flow is less than the minimum air ventilation requirements
-Answer mechanical ventilation must be provided.
if knob-and-tube wiring exists in the attic? -Answer document in the work order as a
hazard
decommission knob and tube prior to? -Answer the installation of insulation
Situation permitting the electrican my select one of these two options for knob and tube,