DMC 2010-13 STUDY GUIDE WITH
COMPLETE SOLUTION


All Geodetic Engineering surveys shall be conducted using ______ - ANSWER
survey grade GNSS receivers

(Geodetic Control Survey)

Project area selected shall be based on the recommendation of
the__________concerned - ANSWER Regional Executive Director (RED)

(Geodetic Control Survey)

Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued by
the - ANSWER NAMRIA Administrator

A copy of the ________ shall be transmitted to the contractor and shall signal
the start of survey activities - ANSWER Contract with the Notice to Proceed

The date when the contractor received the said documents shall serve as the
official date of - ANSWER Commencement of the Project

(Geodetic Control Survey Party 3 Basic Components)

a.) ________ for general supervision, coordination activities, administrative and
other related matters. - ANSWER Project Main Office

Chief of Party shall be a - ANSWER licensed Geodetic Engineer

(Geodetic Control Survey Party 3 Basic Components)

b.) _______ for data research, computations, cartographic, and other related
activities - ANSWER Office Operations

,Manpower shall include computer literate personnel with knowledge on -
ANSWER GNSS processing software.

(Geodetic Control Survey Party 3 Basic Components)

c.) _____ for reconnaissance, monument setting, observations, and other
related activities. - ANSWER Field Operations

Field Operations are composed of - ANSWER 1) Survey Control Team

2) Reconnaissance and Monument Recovery Team

3) Monument Setting Team

All personnel in the three components mentioned (Geodetic Control Survey)
shall be listed in the proposed - ANSWER Geodetic Control Work Plan

The Geodetic Control Work Plan shall be composed of - ANSWER Project
Management and Technical Plans

The Work Plan with the aforementioned documents together with the sketch
plan of the project site shall be forwarded to the ______ for approval before
the commencement of the project - ANSWER NAMRIA

The approved Work Plan shall form part of the - ANSWER Survey Returns

Composed of:

1.) Geodetic Control Survey Party

2.) Financial Plan

3.) Equipment complement for the project and their corresponding allocation
in the different phases of work, both in the office and in the field.

4.) The estimated duration of the project expressed in number of days as per

, component project activities shall be presented in an Activity Graph, Time
and Motion Diagram, PERT-CPM, etc. - ANSWER Project Management Plan

Composed of:

1.) NAMRIA Topographic Map of the area (used as Base Map)

2.) Estimated number of control points to be established

3.) Proposed leveling measurement activities (if NAMRIA has no available
data of the area) - ANSWER Technical Plan

Using available NAMRIA Topographic Map of the area, the estimated
boundary sketch of the project site shall be plotted on appropriate scale. This
shall be used as the _________ for the Geodetic Network Design. - ANSWER
base map




The individual status of reference points of previously established Geodetic
Control and Project Control Network adjacent to or within the project area
shall be _______,_______ and ________ - ANSWER researched, evaluated and
verified




The corresponding _______ both in the Local and in the Philippine Plane
Coordinate System (PPCS), of the reference point shall be determined -
ANSWER Geographic Position and Plane Coordinates (GPPC)




The network design shall be composed of ________ control points and shall
serve as guide in the conduct of actual ground survey. - ANSWER

Document information

Uploaded on
October 31, 2024
Number of pages
26
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Smooth
4.1
(67)
Sold
353
Followers
216
Items
3029
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions