A ✔️✔️Q. 201: The inputs for developing a test plan are taken from
A. Project plan
B. Business plan
C. Support plan
D. None of the above
D ✔️✔️Q. 202: A tool that supports traceability, recording of incidents or scheduling of tests is
called:
A. A dynamic analysis tool
B. A test execution tool
C. A debugging tool
D. A test management tool
E. A configuration management tool
A ✔️✔️Q. 203: Which of the following is not a static testing technique
A. Error guessing
B. Walkthrough
,C. Data flow analysis
D. Inspections
A ✔️✔️Q. 204: Which document specifies the sequence of test executions?
A. Test procedure specification
B. Test design specification
C. Test case specification
D. Test plan
D ✔️✔️Q. 205: Inspections can find all the following except
A. Variables not defined in the code
B. Spelling and grammar faults in the documents
C. Requirements that have been omitted from the design documents
D. How much of the code has been covered
D ✔️✔️Q. 206: Which of the following is not a characteristic for Testability?
A. Operability
B. Observability
C. Simplicity
D. Robustness
B ✔️✔️Q. 207: Software testing accounts to what percent of software development costs?
A. 10-20
B. 40-50
,C. 70-80
D. 5-10
B ✔️✔️Q. 208: Which tool can be used to support and control part of the test management process?
A. Coverage management tool
B. Test management tool
C. Data preparation tool
D. Performance testing tool
C ✔️✔️Q. 209: If an expected result is not specified then:
A. We cannot run the test
B. It may be difficult to repeat the test
C. It may be difficult to determine if the test has passed or failed
D. We cannot automate the user inputs
B ✔️✔️Q. 210: When should we stop our testing?
A. This question is difficult to answer
B. The answer depends on the contract with the client, special requirements if any & risks your
organization is willing to take
C. The answer depends on the experience & maturity of your developers
D. The answer should be standardized for the software development industry
D ✔️✔️Q. 211: The purpose of requirement phase is
A. To freeze requirements
B. To understand user needs
, C. To define the scope of testing
D. All of the above
D ✔️✔️Q. 212: Which of these can be successfully tested using Loop Testing methodology?
A. Simple Loops
B. Nested Loops
C. Concatenated Loops
D. All of the above
A ✔️✔️Q. 213: Cyclomatic Complexity method comes under which testing method.
A. White box
B. Black box
C. Green box
D. Yellow box
B ✔️✔️Q. 214: A reliable system will be one that:
A. Is unlikely to be completed on schedule
B. Is unlikely to cause a failure
C. Is likely to be fault-free
D. Is likely to be liked by the users
B ✔️✔️Q. 215: Which, in general, is the least required skill of a good tester?
A. Being diplomatic
B. Able to write software