Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 35 pagina's
Essay

Unit 9: IT Project Management - Assignment 2 & 3 (Learning Aim B & C) (All Criterias Met)

Document preview thumbnail
Voorbeeld 2 van de 35 pagina's

This essay/assignment covers Unit 9 - IT Project Management Assignments 2 and 3 with all criterias met to achieve the highest grade (Distinction) along with correct structure. Just follow the content step by step to save time and also to reduce complexity. Note: This will support those in achieving distinction in an effortless way where possible. Criteria covered: Learning Aim B: P3: Researched with some inconsistencies an IT problem, based on a given theme and scope out at least two alternative solutions. P4: Prepared a feasibility study on an IT project with some inconsistencies and selected a preferred solution. M2: Assessed consistently at least two adequately researched solutions to an IT problem on a given theme and recommended a preferred solution. D2: Evaluated consistently and comprehensively at least two researched and realistic solutions to an IT problem on a given theme and justified using logical chains of reasoning a preferred solution. Learning Aim C: P5: Planned with some inconsistencies and/or omissions the implementation of an IT project. P6: Executed with some inconsistencies and/or omissions the implementation of an IT project. P7: Monitored and controlled with some inconsistencies and/or omissions the implementation of an IT project M3: Performed soundly and consistently appropriate project management processes to implement an IT-based project. D2: Evaluated consistently and comprehensively at least two researched and realistic solutions to an IT problem on a given theme and justified using logical chains of reasoning a preferred solution. D3: Performed consistently and effectively appropriate project management processes to implement an IT-based project.

Voorbeeld van de inhoud

Name: John Atkinson Unit 9 – Learning Aim B/C Date: 20/10/2019

Unit 9 – IT Project Management
Assignment 2 & 3



Unit introduction:
In this assignment, I will be initiating the project by researching a problem with using my creative skills to
generate a range of solutions. I will also undertake a feasibility study to select an appropriate solution and
outline the requirements of the project. Furthermore, I will be planning and executing to undertake a major
project as part of my BTEC course. Lastly, I will be carrying out the plans that I have made by using an
appropriate methodology to explain and analyze the useful contents and by investigating the benefits and
drawbacks of this methodology.



Initiating the project:

Scenario/ user requirements:
 The first requirement would be the participants that are required to enter the tournament as
individuals or as part of a team
 The second requirement will be forming into 4 teams with 5 members each and 20 spaces for
individual competitors
 The third requirement would be to complete 5 events in each team or individuals

The scenario to initiate the project will include:

 Each event that will be defined as a team or individual event
 The events will vary in type, from sporting to academic challenges
 Individuals and teams will be awarded points according to their rank within each event
 The points awarded for each event are yet undecided and the college are willing to hear any
suggestions you may have
 Also, the college would like to include the possibility of entering for one event only


Scope of this project:
The scope of this project will cover the application requirements which will require users to record and
store their scores across numerous events. In addition, there will be four teams with at least five members
per team and they will participate in different types of events of either individual or team where possible.
The scoring system will be decided later for each event once they are all finished. However, this will be
recorded to singular events separately.

Input of this project:
The input of this project will be the individuals and four teams with points being awarded from 0 – 5. These
inputs will be the score achieved, team names and users that will be entering their personal details such as
name, surname and date of birth. From this, their records will be saved automatically when they have
finished or have completed one or more events.

Process of this project:
The process of this is that the application will take the input that have been recorded to the system and
then form a calculation to add up the total points earned across all events which will then generate the
number of positions each member will be in. An example of this could be individuals that could receive the
following points that include the following:

, Name: John Atkinson Unit 9 – Learning Aim B/C Date: 20/10/2019


5 points earned from Bowling
3 points earned from Cycling
0 points earned from Golf
2 points earned from Swimming
1 point earned from Wrestling

Subsequently, the total score that will be saved is 11 points that will be displayed by the user of the
application along with other competitors.
Output of this project:
The outputs of the application would be to retrieve the data that have been provided and then producing a
report to display the results that have been revealed by going to the summary section of the application.
Also, the results would be indicating the number of points users earned with their details addressed such as
name, date, address and many more.

Storage of this project:
The application would need to store the data to a back-up location to prevent any corruption or losing any
of the files. Therefore, it would be essential to save data regularly in order to load the data easily and
continue where they left off since the application may suddenly crash and then result with having to restart
the application.

User Interface of this project:
The chosen user interface of the application for the project would highly be graphical user interface (GUI)
as this type of interface is visually instinctive and suitable. This type of user interface will allow users to
utilize quicker and enable users to utilize graphical or appealing buttons/icons whereas the other interface
(which is called Command Line Interface) provides a simple text-based user interface allowing users to view
and manage files but they would have to manually enter the name of the teams or individuals with the
scores being put in place for events that they have contributed in and this would consume time. Therefore,
the best preferable interface will be Graphical User Interface.

Once users have inputted their scores, they should instantly have access to the total scores they have
gained from all the events. Also, there would be no more than two clicks away since there is an option
limitation on the application and would therefore make it simpler and trouble-free.


Timescale & Options for this project:
The timescale for this project would be around spring and summer as most events would usually take place
in these terms. The times would usually be in morning and afternoon from 10:30AM to 17:00 which gives
users enough time to contribute to as many events as possible. Additionally, there will be some planning to
when the actual event will start and what time it will finish.

Project completion duration:
Towards creating my application or project, there will be a timeline to when the event/project application
will be completed and if there are any changes to be made afterwards. From this, I had investigated that it
would take approximately 2 – 3 months which means that this would be taken to December and January
for it to be fully completed.




Milestones

Documentinformatie

Study Level
Subject
Geüpload op
6 februari 2020
Aantal pagina's
35
Geschreven in
2019/2020
Type
Essay
Docent(en)
Onbekend
Cijfer
Onbekend
$14.65
Gekocht door 89 studenten

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
johnatkinson
3.7
(390)
Verkocht
1540
Volgers
997
Items
18
Laatst verkocht
4 maanden geleden

Reviews van geverifieerde kopers




Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen