Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Walmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification with Complete Solutions

Document preview thumbnail
Preview 2 out of 9 pages

Walmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification with Complete SolutionsWalmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification with Complete SolutionsWalmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification with Complete Solutions The 1970's law that set into place the regulation of stormwater is: -the federal pollution discharge elimination rule -the stormwater pollution control act -the national water control act -the clean water act - ANSWER-the clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation -NOI -NPDES -NOT -DOT - ANSWER-NPDES Which of the following is never an allowable stormwater discharge from a construction site?

Content preview

Walmart / Sam's Safety, Employment,
Waste, Stormwater Compliance
Certification with Complete Solutions

The 1970's law that set into place the regulation of stormwater is:
-the federal pollution discharge elimination rule
-the stormwater pollution control act
-the national water control act
-the clean water act - ANSWER-the clean water act


Requirements for managing stormwater activity on a construction site are outlined in the
following regulation
-NOI
-NPDES
-NOT
-DOT - ANSWER-NPDES


Which of the following is never an allowable stormwater discharge from a construction
site?
-discharge from burrow areas
-discharge from contaminated groundwater
-discharge from dewatering activities
-discharge from staging areas - ANSWER-discharge from contaminated groundwater


The notice of termination can be filed when
-general contractor applies seed and mulch near the end of the project
-at the end of rainy season

, -all construction activity, inside and outside the building, is complete and permanent
stabilization has been verified as adequate to meet permit requirements
-only offsite street work is left - ANSWER-all construction activity, inside and outside the
building, is complete and permanent stabilization has been verified as adequate to meet
permit requirements


Relative to stormwater permitting, all of the following must occur before construction
starts except
-prepare the SWPPP
-determine the operator(s)
-submit the notice of intent (NOI)
-submit the notice of termination (NOT) - ANSWER-submit the notice of termination
(NOT)


The stormwater notice of intent (NOI) must be submitted
-after the sediment discharge
-after the SWPPP is prepared and before starting construction
-after stormwater BMPs have been installed
- after stormwater inspectors issue a violation - ANSWER-after the SWPPP is prepared
and before starting construction


Potential pollutant source stored on a construction site may include
-petroleum storage tanks
-soil amendments
-masonry materials
-all of the above - ANSWER-all of the above


The SWPPP implementation sequence may be modified
-as the qualified inspector deems necessary
-after consulting with the project SWPPP designer (CEC) and, if required, the project
owner and receiving written approval

Document information

Uploaded on
October 24, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1
3.9
(459)
Sold
1698
Followers
1073
Items
18441
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions