What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - ANSWER-Splicing What should be of major concern when considering surfaces for crane set up locations? - ANSWER-Voids, tanks, loose fill, depressions Which items are included in the suspended weight when calculating parts of line? - ANSWER-Load weight, rigging, load block What site condition must an operator be concerned about prior to setting up a crane? - ANSWER-Soil stability must be sufficient What is an example of duty cycle crane operations? - ANSWER-High speed concrete placement Where must barriers be erected in accessible areas to provide protection in the cranes work area? - ANSWER-Within the equipment's rotating superstructure According to ASME B30.5, How frequently is a crane operator required to have a physical? - ANSWER-Every 3 years What is the result of rapid hoist acceleration? - ANSWER-Produces hook loads higher than actual weight Wire rope lubricant should not: - ANSWER-hinder visual inspection On what principle is crane stability based? - ANSWER-leverage

Meer zien Lees minder
Instelling
NCCCO CORE
Vak
NCCCO CORE









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
NCCCO CORE
Vak
NCCCO CORE

Documentinformatie

Geüpload op
21 oktober 2024
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

NCCCO CORE Exam Questions With
comprehensive, Verified Solutions

What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? -
ANSWER-Splicing



What should be of major concern when considering surfaces for crane set up locations?
- ANSWER-Voids, tanks, loose fill, depressions



Which items are included in the suspended weight when calculating parts of line? -
ANSWER-Load weight, rigging, load block



What site condition must an operator be concerned about prior to setting up a crane? -
ANSWER-Soil stability must be sufficient



What is an example of duty cycle crane operations? - ANSWER-High speed concrete
placement



Where must barriers be erected in accessible areas to provide protection in the cranes
work area? - ANSWER-Within the equipment's rotating superstructure



According to ASME B30.5, How frequently is a crane operator required to have a
physical? - ANSWER-Every 3 years



What is the result of rapid hoist acceleration? - ANSWER-Produces hook loads higher
than actual weight



Wire rope lubricant should not: - ANSWER-hinder visual inspection



On what principle is crane stability based? - ANSWER-leverage

, Who must confirm that an overhead power line is de-energized? - ANSWER-Line owner



The use of equipment to hoist personnel is prohibited except where the employer can
demonstrate what? - ANSWER-Other methods would be more hazardous



Which of the following would not cause the effect of impact loading on the crane?

A. Sudden snatching of the load

B. Rapid hoist acceleration

C. High boom angle operations in windy conditions

D. Graduated lever control application - ANSWER-D. Graduated lever control
application



According to OSHA 1926 subpart cc, How frequently must operational aides be
checked? - ANSWER-Each shift



What is the minimum number of parts of line required to lift a load that weighs 38,588
lbs. ? - ANSWER-4



Which factor is the most important to consider about site access? - ANSWER-
Compaction of approach roads



What is one purpose of the load moment indicator? - ANSWER-To warn the operator of
an overload condition



How are construction site hazards and restrictions located and identified? - ANSWER-A
pre-operational work site inspection



How many calendar days may a crane work with a broken anti two-block devise, after
receipt of the parts? - ANSWER-7
$10.69
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
Vaster
5.0
(2)

Ook beschikbaar in voordeelbundel

Thumbnail
Voordeelbundel
NCCCO EXAM BUNDLE QUESTIONS WITH 100% COMPLETE SOLUTIONS
-
25 2024
$ 271.45 Meer info

Maak kennis met de verkoper

Seller avatar
Vaster Stanford University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
4
Lid sinds
1 jaar
Aantal volgers
1
Documenten
794
Laatst verkocht
1 maand geleden

5.0

2 beoordelingen

5
2
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen