Questions And Answers Latest Top Score.
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full
rated load, plus a direct side load equal to what percent of the rated load? - correct
answer. 2%
The part of the load chart governed by stability is based on what percentage of capacity
while a crawler crane is working over the side quadrant? - correct answer. A. 75%
The most unstable working quadrant for a crawler crane is the; - correct answer.
Side
What type of capacity is listed on a crane load chart? - correct answer. Static
If the manufacture of a particular crane does not specifically permit pick and carry
operations what procedure must be followed during this operation? - correct answer.
Don't make any pick and carry lifts
What is the main purpose of a jib/extension? - correct answer. To extend reach
higher or up and over
When the number of layers of rope on a drum increase the line pull___________. -
correct answer. Decreases
When handling boom sections, the best place for slings to be attached is; - correct
answer. At the pin connections at the ends of the top chords
Placing timber blocking under the tips of the tracks on a crawler crane will; - correct
answer. Make the crane more stable
What is the major effect of stopping suddenly a rapid swing while operating long boom
crane? - correct answer. Action may cause the crane boom collapse and/or overturn
the crane
According to B30.10 hooks shall be removed from service when the throat opening
exceeds _____ the original throat opening. - correct answer. 5%
, On a crawler crane ground bearing pressure is greatest where? - correct answer.
Over the corner
During disassembly of a long boom, the pendant lines are connected at the maximum
cantilever point and the boom is slightly lifted off the ground, which boom connection
pins are to be removed next? - correct answer. The bottom pins ahead of the
cantilever point
Most crane manufactures require the load chart capacities must be reduced when wind
speed reaches; - correct answer. 20 mph
The definition of cantilever of a lattice boom crane is; - correct answer. The boom
suspended past the pendant connections
What chart do you use when operating a crane on a barge; - correct answer. List
chart
According to OSHA, Jibs must have a positive ________ from backwards overturning -
correct answer. Stop
Mobile cranes on barges shall be - correct answer. Physically attached to the barge
When a crane is properly barricaded, what is the clearance required all the way around
360 degrees between the superstructure and the barricade when swung 360 degrees? -
correct answer. 2 feet
According to ASME B30.5 a fire extinguisher shall have a rating of __________ and
shall be available at all operator's stations or cabs of the equipment. - correct answer.
10 BC or higher
When assembling a lattice boom crane the top pins of the boom sections should be
inserted; - correct answer. First
Block hoisting sheaves should have a minimum pitch diameter of at least________ the
rope diameter. - correct answer. 16 times
What is the correct method of checking the brakes of crane that has been already
assembled? - correct answer. Lift the load a few inches off the ground and apply the
brakes
A long boom crane working at minimum radius and 3 degrees out of level will have a
loss of capacity by; - correct answer. 50%
Can rotation resistant rope be used with a swivel? - correct answer. If approved by
the rope's manufacture