• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

Nicet Level 2 Study Graded A {2024/2025

Document preview thumbnail
Preview 3 out of 21 pages

Nicet Level 2 Study Graded A {2024/2025} What is the Tack coat color distortion when applied? - CORRECT ANSWER Brown to Black What is the Asphalt Compaction Tolerance? - CORRECT ANSWER 1/4" What grade is asphalt considered? - CORRECT ANSWER Open Grade When should asphalt be placed after Tack Coat has been applied? - CORRECT ANSWER Within 4 Hours of the Tack Coat application Where and how should you sample Asphalt? - CORRECT ANSWER From the truck and in 3 increments, each increment from a different quadrant What is a another method of testing Asphalt? - CORRECT ANSWER Coring full de

Content preview

Nicet Level 2 Study Graded A {2024/2025}




What is the Tack coat color distortion when applied? - CORRECT
ANSWER Brown to Black


What is the Asphalt Compaction Tolerance? - CORRECT ANSWER 1/4"

What grade is asphalt considered? - CORRECT ANSWER Open Grade

When should asphalt be placed after Tack Coat has been applied? -
CORRECT ANSWER Within 4 Hours of the Tack Coat application


Where and how should you sample Asphalt? - CORRECT ANSWER From
the truck and in 3 increments, each increment from a different
quadrant

What is a another method of testing Asphalt? - CORRECT ANSWER
Coring full depth sections of the roadway and amount is based on
contract or provisions.

How do you test asphalt? - CORRECT ANSWER Asphalt is tested based
on nuclear density gauge

What is the testing tolerance for Density Nuclear gauge? - CORRECT
ANSWER +/- 1% on density and +/-2% on moisture


What is the Asphalt compaction tolerance? - CORRECT ANSWER +/-0.5
percent

What is the Asphalt compaction requirement? - CORRECT ANSWER
95% compaction

,What is the offset of the longitudinal joint for Asphalt - CORRECT
ANSWER Each joint should be offset by 6"


Asphalt Tickets should contain What information - CORRECT ANSWER
Contract Number, Item Number, Job mix formula, Tonnage, Date and
Time

What s the Pavement surface tolerance? - CORRECT ANSWER 1/4"
tolerance

How to measure surface tolerance? - CORRECT ANSWER Straight edge
or string line

How should Asphalt roller pattern begin - CORRECT ANSWER Outside
edges working to center line

How is Asphalt Finished? - CORRECT ANSWER either by compaction or
temp reduction

What do you inspect for surface prep when is come to Concrete
Paving? - CORRECT ANSWER Inspect Sub grade soils and grading
uniformity

What is Concrete paving subbase thickness and characteristics? -
CORRECT ANSWER Thickness of 4-6" and Uniformity, pumping, control
and erosion Resistances

What is the Concrete paving surface coverage? - CORRECT ANSWER
Min of 2"

What is the Min and Max of Dowel overlapping - CORRECT ANSWER 2"
to 6" and 2" of clear cover

How are Tiebars placed and what is the spacing? - CORRECT ANSWER
Drilled into the Slap or placed in the keyway and 1' Spacing

What is the load transfer assemblies spacing - CORRECT ANSWER
Every 15' 1/2"

, What should be placed on forms before concrete placement? -
CORRECT ANSWER Form oil to provide neat edges


What is the Transverse joint spacing? - CORRECT ANSWER Every 4'

When does Concrete pavement curing process begin? - CORRECT
ANSWER Immediately after finishing


How long does concrete pavement take to cure? - CORRECT ANSWER
Minimum of 14 days to achieve compressive strength

What are concrete paving curing methods - CORRECT ANSWER Burlap
(Wet Cure), Liquid Membrane( preferred method)

When can the curing compound be sprayed on concrete surface? -
CORRECT ANSWER immediately after film disappeared


What is the concrete paving finishing tolerance? - CORRECT ANSWER
1/4" for 5' or 1/8th for 10'

How is finishing tolerances tested - CORRECT ANSWER by means of
string line or straight edge.
String line: for alignment and grade
Straight edge: finishing

What are the testing methods of concrete? - CORRECT ANSWER Air:
5.0%, Slump: 3-4" (+/-.5), Temp: Min 40-55 and MAx- 90 degrees

What is the air acceptance? - CORRECT ANSWER +/- 0.5 to 1.5%

What is the purpose of slump test? - CORRECT ANSWER To test
workability of concrete

How long should Longitudinal joints be? - CORRECT ANSWER Should
not exceed 14'

Document information

Uploaded on
October 17, 2024
Number of pages
21
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CornelWest
3.7
(269)
Sold
1680
Followers
1131
Items
14041
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions