DVP SWPPP Flashcards Questions And Answers 100% Guaranteed Success. The 1970s law that set into place the regulation of stormwater is - correct answer. The clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation - correct answer. NPDES Which of the following is never an allowable stormwater discharge from a construction site - correct answer. Discharge from contaminated ground water The notice of termination can be filed when - correct answer. All construction activity, inside and outside of the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements Relative to stormwater permitting all of the following must occur before construction starts except - correct answer. Submit the notice of termination (NOT) The stormwater notice of intent (NOI) must be submitted - correct answer. After the SWPPP is prepared and before starting construction Potential pollutant sources stored on a construction site may include - correct answer. 1. Petroleum storage tanks 2. Soil sediments 3. Masonary material 4. ALL OF THE ABOVE The SWPPP inflammation sequence may be modified - correct answer. After consulting with the project SWPPP Designer (CEC) and, if required, the project owner and receiving written approval A SWPPP site map will show all of the following except - correct answer. Notices of violation Which of the following information is to be posted at the entrance of the site - correct answer. 1. Construction site notice 2. Permit authorization 3. Location of SWPP 4. ALL OF THE ABOVE Which of the following is NOT A beneficial use of water - correct answer. Flushing a spill down a storm drain When installing and maintaining a check dam make sure - correct answer. The low point (overflow) of the check dam is in the middle of the channel To reduce the possibility of undercutting in channels, you should - correct answer. Install filter fabric under rock and similar materials placed within the stormwater conveyance The good housekeeping section of the SWPP must include all BUT which of the following - correct answer. Post construction stormwater management procedures Runoff controls include all but which of the following - correct answer. Rolled erosion control products Which erosion control best management practice increases water filtration, dissipates rainfall energy and slows over flow of stormwater - correct answer. Vegetation Of the following factors that influence erosion rates, the one a contractor has the most control over (only select one) is - correct answer. Groundcover Temporary stabilization should be implemented - correct answer. Immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more The primary purpose of a construction exit is - correct answer. To remove sediment from construction site vehicles and minimize trackout Common types of erosion include all of the following except - correct answer. Sedimentation Proper spill management should include all of the following EXCEPT - correct answer. Installation of a spill pit on your construction site The best location for portable toilets on your construction site is - correct answer. On ground level, in low construction traffic areas The following must be marked on site maps in the job site trailer as work progresses - correct answer. The dates when BMP changes or additions take place While inspecting field BMP's the SWPPP inspector should perform all of the following EXCEPT - correct answer. Assume BMP's are in good condition from a distance

Content preview

DVP SWPPP Flashcards Questions And
Answers 100% Guaranteed Success.

The 1970s law that set into place the regulation of stormwater is - correct answer. The
clean water act

Requirements for managing stormwater activity on a construction site are outlined in the
following regulation - correct answer. NPDES

Which of the following is never an allowable stormwater discharge from a construction
site - correct answer. Discharge from contaminated ground water

The notice of termination can be filed when - correct answer. All construction activity,
inside and outside of the building, is complete and permanent stabilization has been
verified as adequate to meet permit requirements

Relative to stormwater permitting all of the following must occur before construction
starts except - correct answer. Submit the notice of termination (NOT)

The stormwater notice of intent (NOI) must be submitted - correct answer. After the
SWPPP is prepared and before starting construction

Potential pollutant sources stored on a construction site may include - correct answer.
1. Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE

The SWPPP inflammation sequence may be modified - correct answer. After
consulting with the project SWPPP Designer (CEC) and, if required, the project owner
and receiving written approval

A SWPPP site map will show all of the following except - correct answer. Notices of
violation

Which of the following information is to be posted at the entrance of the site - correct
answer. 1. Construction site notice
2. Permit authorization
3. Location of SWPP

, 4. ALL OF THE ABOVE

Which of the following is NOT A beneficial use of water - correct answer. Flushing a
spill down a storm drain

When installing and maintaining a check dam make sure - correct answer. The low
point (overflow) of the check dam is in the middle of the channel

To reduce the possibility of undercutting in channels, you should - correct answer.
Install filter fabric under rock and similar materials placed within the stormwater
conveyance

The good housekeeping section of the SWPP must include all BUT which of the
following - correct answer. Post construction stormwater management procedures

Runoff controls include all but which of the following - correct answer. Rolled erosion
control products

Which erosion control best management practice increases water filtration, dissipates
rainfall energy and slows over flow of stormwater - correct answer. Vegetation

Of the following factors that influence erosion rates, the one a contractor has the most
control over (only select one) is - correct answer. Groundcover

Temporary stabilization should be implemented - correct answer. Immediately on all
disturbed areas that are likely to or will remain inactive for 14-days or more

The primary purpose of a construction exit is - correct answer. To remove sediment
from construction site vehicles and minimize trackout

Common types of erosion include all of the following except - correct answer.
Sedimentation

Proper spill management should include all of the following EXCEPT - correct answer.
Installation of a spill pit on your construction site

The best location for portable toilets on your construction site is - correct answer. On
ground level, in low construction traffic areas

The following must be marked on site maps in the job site trailer as work progresses -
correct answer. The dates when BMP changes or additions take place

While inspecting field BMP's the SWPPP inspector should perform all of the following
EXCEPT - correct answer. Assume BMP's are in good condition from a distance

Document information

Uploaded on
October 17, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectsadh
3.9
(80)
Sold
416
Followers
106
Items
13274
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions