The temperature may be measured in a wall form - answer-True
The temperature measuring device must remain in the concrete for a minimum of? - answer-2 Minutes
With large aggregate of 3" diameter the concrete temperature may take up to twenty minutes to stabilize due to heat transfer from the aggregate to the cement paste. - answer-True
The maximum time allowable time in between obtaining the first and final portion of a composite sample is? - answer-15 Minutes
The minimum size of a composite sample required when strength specimens are to be molded - answer-1.0CF
Sampling form a stationary mixer or revolving drum mixer, the batch must be sampled at _____ or more regularly spaced intervals - answer-3
The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - answer-5
The test for slump, temperature, and air content must begin within ____ minutes after fabricating the composite sample. - answer-5
The sample should be combined and remixed before testing begins. - answer-True
Composite samples must be taken before any water is added. - answer-False
The composite sample from a truck mixer is taken from the _____ portion of the batch. - answer-Middle
The slump test is applicable to concrete having a nominal maximum aggregate size of ____ in. - answer-1.5
The slump mold is filled in ____ layers of equal volume. - answer-3
The sample of concrete used for the test must be obtained in accordance to ASTM _____. - answer-C172
Each layer should be rodded _______ times. - answer-25
The sides of the slump cone should be lightly tapped after rodding each layer. - answer-False
The slump cone cannot be made of any other material but metal. - answer-False
The tamping rod should penetrate the previous layer approximately ___________. - answer-1 Inch
When rodding the bottom layer, the tamping rod should be _____ to uniformly distribute the strokes - answer-held on a slight incline
The slump cone must be raised of the concrete in _________ seconds. - answer-3-7
The approximate depth of concrete after the second layer has been rodded is _____inches. - answer-6 1/8
The slump cone must be raised n 5 seconds +/- 2 seconds. - answer-True
The slump is measured to the ________of the concrete sample. - answer-displaced original center
The approximate depth of concrete after the first layer has been rodded is ______inches. - answer-2-5/8
The slump is reported and recorded to the nearest _________inch. - answer-1/4
One or both ends of the tamping rod must be - answer-rounded to a hemispherical tip
The slump cone is ____________ inches in height. - answer-12
The tamping rod is ____inches in diameter and ______inches in length. - answer-5/8, 24
How much time is allowed to complete the slump test (from the first scoop of concrete to the removal of the slum cone)? - answer-2.5 Minutes
The diameter of the tamping rod for this test is ____________. - answer-5/8 Inch
A plastic vessel may be used for density tests . - answer-False
The concrete for density test must be sampled in accordance with ASTM _______. - answer-C172
What is the minimum thickness in inches of a metal strike-off plate? - answer-1/4"
What is the minimum thickness in inches of a glass or acrylic strike-off plate? - answer-1/2 Inch
Air meter bowls used for this test must conform to ASTM ___________. - answer-C231
If vibration is used to consolidate the concrete for density tests, the measure is filled in __ layers of equal volume. - answer-2
What is the minimum required frequency (vibration/minute) of the vibrator used for density tests ? - answer-9000
The outside diameter of the vibrating element must be at least ____inches but not greater than ____ inches - answer-.75, 1.25
What is the specified weight (lbs) of the mallet to be used for the density test? - answer-1.25 +/- .5
Rodding or vibration may be used for consolidating concrete for density tests. - answer-True
After consolidation of the final layer for density tests, an excess of approximately ½ inch is considered optimal. - answer-False
The procedures of Method C138 are followed, and the mass of the measure plus the concrete is found to be 95.5 lbs., calculate the density (unit weight) Volume of measure = 0.510CF and the Mass of the empty measure is 18.4 lbs. - answer-151.2 lbs/cf
For a design batch of 7CY, the total mass of all materials batched is 27,300 lbs. Using a density of 143.5lbs/CF calculate the yield per batch in CF. - answer-190
Using the information in question # 48, determine the relative yield for the total batch. - answer-1.005
Using a theoretical density of 151.4lbs/CF and the actual density of 143.5 lbs/CF calculate the gravimetric air content of the concrete in a percentage. - answer-5%
The sample or concrete for the pressure air test must be obtained in accordance to the ASTM ____ standard. - answer-C172
The pressure air test can only be used for concrete mixes with what type of aggregate? - answer-Relative Dense
The maximum size of course aggregate allowed for pressure air test is ________inches. - answer-2
If the concrete is consolidated through rodding for the pressure air test the measure is filled in _____ layers. - answer-3
If the concrete is consolidated through rodding,for the pressure air test the measure is filled in ____layers - answer-3
When the slump of the concrete exceeds ____ inches, vibration cannot be used for the consolidation of the concrete for pressure air tests - answer-3
When rodding the sample for pressure air tests, each layer is rodded ______times - answer-25
When consolidation is done through vibration, for the pressure air test the vibrator is inserted in the mix ___times per layer. - answer-2
You must tap the sides of the measure 10 to 15 times after consolidation is done by vibration for the pressure air test - answer-False
What is the specified weight (lbs) of the mallet when the measure is .05CF or less? - answer-1.25 +/- .5
What are the characteristics, diameter (in) and length (in), of the tamping rod used in the pressure air test method? - answer-5/8,16
A representative sample may be added to correct a slight deficiency after the consolidation of the final layer of the pressure air vessel, prior to striking off the top of the vessel. - answer-True
An excess of approximately ___ (in) left in the measure for the pressure air test is considered to be optimal after the final consolidation of the final layer. - answer-1/8
After rodding each layer in the pressure air test the measure should be tapped 10 to 15 times before the next lift is added. - answer-True
The measure for the pressure air test can be used in determination of ASTM C138 - answer-True
The reading on the pressure gauge is the final air reading. - answer-False
The tamping rod shall penetrate the previous layer approximately ______. - answer-1 Inch
The maximum size of course aggregate allowed for the volumetric air test is _____inches. - answer-1-1/2
The volumetric air test method can be used on ________ aggregate(s) - answer-Any type of
The sample of concrete for the volumetric air test is obtained in accordance with ASTM ______. - answer-C172
The measure of the volumetric air test is filled in _____layers, of equal volume. - answer-2
What are the characteristics, diameter (in) and length (in), of the tamping rod used in the volumetric air test method? - answer-5/8, 12
What is the specified weight of the mallet (lbs) when the volumetric air measure is .05CF or smaller? - answer-1.25 +/-.5
The measure is inverted and shook for a minimum of ____seconds, not being inverted for more than ____seconds at a time. - answer-45, 5
The volumetric
Content preview
In the building industry we need sound solid
material especially concrete which holds all
the structures therefore testing becomes a
very basic item in confirmation of the
required standard
ACI
Concrete
Field
Testing
Technician
- Grade I
Top doctor
ACI CONCRETE FIELD
TESTING TECHNICIAN
GRADE 1 STUDY GUIDE
,