• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

CPESC Exam Study Guide with Complete Solutions

Document preview thumbnail
Preview 2 out of 9 pages

CPESC Exam Study Guide with Complete Solutions NPDES - Answer-National Pollution Discharge Elimination System NPDES Exemptions - Answer-Facility that discharges to a POTW Facility that allows discharge evaporation Facility that allows infiltration/percolation Waters of the United States (WOTUS) - Answer-Any of the following that could be used: 1) Wetlands, 2) Sloughs 3) Prairie pothohles 4) Wet meadows 5) Playa lakes 6) Natural ponds Phase II Discharges - Answer-Commercial, Retail, light industrial and institutional activity Construction activities under 5 acres Municipal separate storm water drain system for less than 100,000. EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 2/9 Phase II Discharge Exempted Activities - Answer-Agricultural Discharges Discharges from Oil and Gas operations Silviculture Activities NOI - Answer-Notice of intent, names general operator and site information SWPPP - Answer-Storm Water Pollution Prevention Plan BMP - Answer-Best Management Practice NOT - Answer-Notice of Termination Submitted after site stabilization Rainfall Erosivity Factor (R) - Answer- TMDL - Answer-Total Maximum Daily Load Construction rainfall erosivity waiver - Answer-Waver for runnoff permit requirement if certain dry conditions permit. SWMP - Answer-Stormwater Management Plan MEP - Answer-Maximum extent practicable Six Minimum Measures for NPEDS - Answer-1) Public Education and Outreach 2) Public Participation and Involvement 3) Illicit Discharge Detection and Elimination EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 3/9 4) Construction Site Runnoff 5) Post-Construction Runoff Control 6) Pollution Prevention/Good housekeeping Triennial Review Process - Answer-Required for states every three years to evaluate their water quality standards. TMDL - Answer-Section 303(d) CWA; establishes loading factors for discharges to watersheds. 303(d) list - Answer-a list of impaired waters, too damaged for use (swimming) and is reissued every two years. Not expected to meet water quality standards Construction Site NTU Monitoring - Answer-Sites larger than 10 ac must have NTU discharge less than 280 except after a 2yr 24hr storm max. Six (6) Planning Stages for stormwater Planning for Construction - Answer-1) Site evaluation and design development 2) Assessment 3) Control selection and plan design 4) Certification and notification 5) Construction implementation

Content preview

EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.




CPESC Exam Study Guide with
Complete Solutions

NPDES - Answer✔✔-National Pollution Discharge Elimination System


NPDES Exemptions - Answer✔✔-Facility that discharges to a POTW


Facility that allows discharge evaporation


Facility that allows infiltration/percolation


Waters of the United States (WOTUS) - Answer✔✔-Any of the following that could be used:


1) Wetlands,


2) Sloughs


3) Prairie pothohles


4) Wet meadows


5) Playa lakes


6) Natural ponds


Phase II Discharges - Answer✔✔-Commercial, Retail, light industrial and institutional activity


Construction activities under 5 acres


Municipal separate storm water drain system for less than 100,000.

Page 1/9

, EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.



Phase II Discharge Exempted Activities - Answer✔✔-Agricultural Discharges


Discharges from Oil and Gas operations


Silviculture Activities


NOI - Answer✔✔-Notice of intent, names general operator and site information


SWPPP - Answer✔✔-Storm Water Pollution Prevention Plan


BMP - Answer✔✔-Best Management Practice


NOT - Answer✔✔-Notice of Termination


Submitted after site stabilization


Rainfall Erosivity Factor (R) - Answer✔✔-


TMDL - Answer✔✔-Total Maximum Daily Load


Construction rainfall erosivity waiver - Answer✔✔-Waver for runnoff permit requirement if

certain dry conditions permit.


SWMP - Answer✔✔-Stormwater Management Plan


MEP - Answer✔✔-Maximum extent practicable


Six Minimum Measures for NPEDS - Answer✔✔-1) Public Education and Outreach


2) Public Participation and Involvement


3) Illicit Discharge Detection and Elimination

Page 2/9

Document information

Uploaded on
October 15, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Emillect
3.0
(4)
Sold
34
Followers
2
Items
2999
Last sold
4 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions