Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Concrete Batch Plant Operator Exam (FDOT) UPDATED ACTUAL Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 5 pages

Concrete Batch Plant Operator Exam (FDOT) UPDATED ACTUAL Questions and CORRECT Answers Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - CORRECT ANSWER- Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? - CORRECT ANSWER- 24 Free moisture of the aggregate means: - CORRECT ANSWER- Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate.

Content preview

Concrete Batch Plant Operator Exam
(FDOT) UPDATED ACTUAL Questions
and CORRECT Answers
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: -
CORRECT ANSWER✔✔- Minimize Free Water Content


Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for
FDOT? - CORRECT ANSWER✔✔- 24



Free moisture of the aggregate means: - CORRECT ANSWER✔✔- Moister on the surface
of an aggregate that is above and beyond the absorbed moister in the aggregate.


If the moister test is done other than by the cook-out method, how often shall the other
methods be verified? - CORRECT ANSWER✔✔- Each week


For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - CORRECT
ANSWER✔✔- 33 thru 37%



In concrete, which material has a specific gravity of one? - CORRECT ANSWER✔✔- Water


What is the air content range for all classes of structural concrete except Class IV Shaft? -
CORRECT ANSWER✔✔- 1.00 thru 6.00%



When can unmetered water be added to the concrete? - CORRECT ANSWER✔✔- Not at
all.


Do not allow the total number of revolution at mixing speed to exceed: - CORRECT
ANSWER✔✔- 160 Revolutions


After all materials have been charged into the transit mixer drum, the concrete must be mixed
at how many revolutions at the plant before leaving for the project? - CORRECT
ANSWER✔✔- 70 to 100

, When the water meters / scales are calibrated, prior to production, at what frequency should
they be checked there after? - CORRECT ANSWER✔✔- 3 moths


To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at
the plant be maintained - CORRECT ANSWER✔✔- 0.5% of maximum load normally
handled


For concrete containing a water-reducing retarding admixture, in an agitator truck, the
maximum time for depositing the concrete shall not exceed: - CORRECT ANSWER✔✔- 90
minutes


If a load of concrete has been rejected due to excessive slump, the concrete may remain in the
transporting vehicle to reduce the slump. - CORRECT ANSWER✔✔- Is not allowed.



Who places the orders for concrete with the producer? - CORRECT ANSWER✔✔- The
contractor


The minimum normal sampling frequency for the chloride content of structural concrete is: -
CORRECT ANSWER✔✔- 1 per design mix in use from the first day of production and
every 30 calendar days or less thereafter.


In what moister condition are the aggregates on the approved concrete mix designs? -
CORRECT ANSWER✔✔- SSD condition


The specific gravity of an aggregate is the ratio of its unit weight to the weight of an equal
absolute volume of: - CORRECT ANSWER✔✔- Water



What is the weight of a bag of Portland cement in the USA? - CORRECT ANSWER✔✔- 94
lbs


What is the maximum concrete temperature allowed when using a hot weather design mix? -
CORRECT ANSWER✔✔- 100 degrees F

Document information

Uploaded on
October 11, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(230)
Sold
1506
Followers
106
Items
107189
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions