• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

SAFe Scrum Master 5.1 Study Guide with Complete Solutions

Document preview thumbnail
Preview 2 out of 6 pages

SAFe Scrum Master 5.1 Study Guide with Complete Solutions During PI planning who owns the planning of stories into iterations? - Answer-Agile teams Who commits to the Iteration goals at the end of Iteration planning? - Answer-Team Becoming a coach requires a shift from old behaviors to new ones. What are three examples of old behaviors? - Focusing on deadlines - Focusing on business value delivery - Asking the team for the answers - Driving toward specific outcomes - Fixing problems for the team - Facilitating team problem solving - Answer-Not sure which 3 What are 2 critical areas that differentiate agile from the waterfall development - Answer- incremental delivery of value and fast feedback Which type of enabler does a System Architect review during a System Demo? -enabler epics EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED FIRST PUBLISH SEPTEMBER 2024 Page 2/6 -enabler stories -enabler features -enabler capabilities - Answer-not sure Why do teams have an iteration Retrospective? - Answer-To Adjust and identify ways to improve Which demo is performed in the IP iteration - Answer-The PI System Demo What are two good scrum master facilitation practices - Answer-Create an environment of safety so that everyone feels comfortable contributing to the discussion Ensure all voices are heard Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do what? - Answer-Continuously Improve the event The business must depend on the team for what in order to do any meaningful planning - Answer- Commitment to the plan What is the purpose of the plan-do-check-adjust cycle as applied to iterations -to give the art team members a process tool to keep the train on the tracks -to create a continuous flow of work to support the delivery pipeline (not this one) -to provide a regular, predictable development cadence to

Content preview

EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024




SAFe Scrum Master 5.1 Study Guide with
Complete Solutions

During PI planning who owns the planning of stories into iterations? - Answer✔✔-Agile teams


Who commits to the Iteration goals at the end of Iteration planning? - Answer✔✔-Team


Becoming a coach requires a shift from old behaviors to new ones. What are three examples of old

behaviors?




- Focusing on deadlines


- Focusing on business value delivery


- Asking the team for the answers


- Driving toward specific outcomes


- Fixing problems for the team


- Facilitating team problem solving - Answer✔✔-Not sure which 3


What are 2 critical areas that differentiate agile from the waterfall development - Answer✔✔-

incremental delivery of value and fast feedback


Which type of enabler does a System Architect review during a System Demo?


-enabler epics


Page 1/6

, EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024


-enabler stories


-enabler features


-enabler capabilities - Answer✔✔-not sure


Why do teams have an iteration Retrospective? - Answer✔✔-To Adjust and identify ways to improve


Which demo is performed in the IP iteration - Answer✔✔-The PI System Demo


What are two good scrum master facilitation practices - Answer✔✔-Create an environment of safety so

that everyone feels comfortable contributing to the discussion


Ensure all voices are heard


Each PI planning meeting evolves over time, and ending PI planning with a Retrospective will help to do

what? - Answer✔✔-Continuously Improve the event


The business must depend on the team for what in order to do any meaningful planning - Answer✔✔-

Commitment to the plan


What is the purpose of the plan-do-check-adjust cycle as applied to iterations


-to give the art team members a process tool to keep the train on the tracks


-to create a continuous flow of work to support the delivery pipeline (not this one)


-to provide a regular, predictable development cadence to produce an increment of value


-to allow the team to perform some final backlog refinement for upcoming iteration planning -

Answer✔✔-not sure



Page 2/6

Document information

Uploaded on
October 7, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmillyCharlotte
3.6
(34)
Sold
155
Followers
5
Items
12350
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions