Which agency approves a site-specific a.) The Regional Water Quality Board
variance which allows for an alternative CCR Title 23, Sec 2681(a)
method of construction or monitoring:
a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance
Control
d.) The local agency
The regulations to enforce compliance of b.) California Code of Regulations; Title 23, Chapter 16
underground storage tank systems in the
state are found in?
a.) Code of Federal Regulations, 40 CFR Part
281
b.) California Code of Regulations, Title 23,
Chapter 16
c.) Code of Federal Regulations, 40 CFR Part
280
d.) California Code of Regulations, Title 23,
Chapter 17
By definition an "underground storage tank b.) The tank, all connected piping, ancillary equipment and containment system
system" includes
a.) The tank, all connected piping and (H&SC, Sec 25281(z))
dispensers
b.) The tank, all connected piping, ancillary
equipment and containment system
c.) Only the tank
d.) Only tanks totally beneath the surface of
the ground
1/23
,10/3/24, 5:37 AM
The written report submitted to the local b.) Cause of the release
agency after an unauthorized release is CCR Title 23, Sec 2652(c)
required to include the following except:
a.) Description of actions taken to stop the
release
b.) Cause of the release
c.) Method of disposal of released product
d.) Date on which the release was
discovered
An unauthorized release which does not D. All of the above
escape from secondary containment only H&SC, Sec 25294
requires a record on the operator's
monitoring reports provided:
A. It did not increase the hazard of fire
B. It did not cause any deterioration of the
secondary containment
C. It was cleaned up within 8 hours of
detection
D. All of the above
The annual monitoring certification may be D. A person who meets the requirements of both a and b
performed by: CCR Title 23, Sec 2715(i)
A. A person possessing the appropriate
contractors licenses
B. An individual trained and certified by the
manufacturer of the monitoring equipment
C. A designated UST operator
D. A person who meets the requirements of
both a and b
When an automatic tank gauge is utilized for c.) Outside air temperature
single-walled tank leak detection, it shall CCR Title 23, Sec 2643(b)(1)
generate a post-test hard copy data report
of the following information, except:
a.) Liquid volume
b.) Fuel depth
c.) Outside air temperature
d.) Time and date of test
If a UST system is utilizing an overfill alarm, c.) 90%
the alarm must be triggered to alert the
transfer operator when the tank is no more
than ______ full
a.) 85%
b.) 95%
c.) 90%
d.) 80%
An automatic tank gauge is utilized for leak a.) Tank
detection of the _______ _. CCR Title 23, Sec 2643(b)(1)
a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space
2/23
, 10/3/24, 5:37 AM
After completion of enhanced leak d.) To both the SWRCB and the local agency
detection (ELD) test, the ELD test results CCR Title 23, Sec 2644.1(a)(5)
must be submitted to the ______ _.
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency
A permit to operate a UST system must have b.) Name of the tank manufacturer and tank capacity
all of the following listed on the permit, CCR Title 23, Sec 2712(c)
EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank
capacity
c.) Permit expiration date
d.) Monitoring requirements
A temporary closure is appropriate for which b.) The UST system has ceased to store hazardous materials but will be used within the
of the following: next 12 consecutive months
a.) The UST system is empty and will be CCR Title 23, Sec 2671 & 2670
removed from service indefinitely
b.) The UST system has ceased to store
hazardous materials but will be used within
the next 12 consecutive months
c.) The UST system is unable to meet
compliance requirements and will be
removed
d.) The UST system has been red-tagged
A local agency determines that a UST facility d.) Inspect the facility and determine compliance
within the last year had compliance issues. CCR Title 23, Sec 2712(c)
Prior to issuing a new permit or renewal to
operate an UST the local agency shall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a
"Return to Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine
compliance
All the following components require third c.) Spill Containment lids
party certification, except:
a.) Automatic tank gauging systems
b.) Statistical inventory reconciliation
methods
c.) Spill Containment lids
d.) Liquid phase out-of-tank products
The exterior surface of an underground c.) Width of the interstitial space
storage tank must bear a marking or label CCR Title 23, Sec 2631(b)
which shows the following information,
except:
a.) Design pressure in psig
b.) Useable capacity in gallons.
c.) Width of the interstitial space
d.) Identity of manufacturer
3/23
EUNICE
ICC California UST Inspector Exam WITH 100% ANSWERS
Terms in this set (390)
Which agency approves a site-specific a.) The Regional Water Quality Board
variance which allows for an alternative CCR Title 23, Sec 2681(a)
method of construction or monitoring:
a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance
Control
d.) The local agency
The regulations to enforce compliance of b.) California Code of Regulations; Title 23, Chapter 16
underground storage tank systems in the
state are found in?
a.) Code of Federal Regulations, 40 CFR Part
281
b.) California Code of Regulations, Title 23,
Chapter 16
c.) Code of Federal Regulations, 40 CFR Part
280
d.) California Code of Regulations, Title 23,
Chapter 17
By definition an "underground storage tank b.) The tank, all connected piping, ancillary equipment and containment system
system" includes
a.) The tank, all connected piping and (H&SC, Sec 25281(z))
dispensers
b.) The tank, all connected piping, ancillary
equipment and containment system
c.) Only the tank
d.) Only tanks totally beneath the surface of
the ground
1/23
,10/3/24, 5:37 AM
The written report submitted to the local b.) Cause of the release
agency after an unauthorized release is CCR Title 23, Sec 2652(c)
required to include the following except:
a.) Description of actions taken to stop the
release
b.) Cause of the release
c.) Method of disposal of released product
d.) Date on which the release was
discovered
An unauthorized release which does not D. All of the above
escape from secondary containment only H&SC, Sec 25294
requires a record on the operator's
monitoring reports provided:
A. It did not increase the hazard of fire
B. It did not cause any deterioration of the
secondary containment
C. It was cleaned up within 8 hours of
detection
D. All of the above
The annual monitoring certification may be D. A person who meets the requirements of both a and b
performed by: CCR Title 23, Sec 2715(i)
A. A person possessing the appropriate
contractors licenses
B. An individual trained and certified by the
manufacturer of the monitoring equipment
C. A designated UST operator
D. A person who meets the requirements of
both a and b
When an automatic tank gauge is utilized for c.) Outside air temperature
single-walled tank leak detection, it shall CCR Title 23, Sec 2643(b)(1)
generate a post-test hard copy data report
of the following information, except:
a.) Liquid volume
b.) Fuel depth
c.) Outside air temperature
d.) Time and date of test
If a UST system is utilizing an overfill alarm, c.) 90%
the alarm must be triggered to alert the
transfer operator when the tank is no more
than ______ full
a.) 85%
b.) 95%
c.) 90%
d.) 80%
An automatic tank gauge is utilized for leak a.) Tank
detection of the _______ _. CCR Title 23, Sec 2643(b)(1)
a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space
2/23
, 10/3/24, 5:37 AM
After completion of enhanced leak d.) To both the SWRCB and the local agency
detection (ELD) test, the ELD test results CCR Title 23, Sec 2644.1(a)(5)
must be submitted to the ______ _.
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency
A permit to operate a UST system must have b.) Name of the tank manufacturer and tank capacity
all of the following listed on the permit, CCR Title 23, Sec 2712(c)
EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank
capacity
c.) Permit expiration date
d.) Monitoring requirements
A temporary closure is appropriate for which b.) The UST system has ceased to store hazardous materials but will be used within the
of the following: next 12 consecutive months
a.) The UST system is empty and will be CCR Title 23, Sec 2671 & 2670
removed from service indefinitely
b.) The UST system has ceased to store
hazardous materials but will be used within
the next 12 consecutive months
c.) The UST system is unable to meet
compliance requirements and will be
removed
d.) The UST system has been red-tagged
A local agency determines that a UST facility d.) Inspect the facility and determine compliance
within the last year had compliance issues. CCR Title 23, Sec 2712(c)
Prior to issuing a new permit or renewal to
operate an UST the local agency shall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a
"Return to Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine
compliance
All the following components require third c.) Spill Containment lids
party certification, except:
a.) Automatic tank gauging systems
b.) Statistical inventory reconciliation
methods
c.) Spill Containment lids
d.) Liquid phase out-of-tank products
The exterior surface of an underground c.) Width of the interstitial space
storage tank must bear a marking or label CCR Title 23, Sec 2631(b)
which shows the following information,
except:
a.) Design pressure in psig
b.) Useable capacity in gallons.
c.) Width of the interstitial space
d.) Identity of manufacturer