• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

Erosion and Sediment Control Test 1 Answered Correctly

Document preview thumbnail
Preview 2 out of 12 pages

2-year, 24-hour storm even - Correct Answer maximum 24-hour precipitation event with a probable recurrence interval of once in two years as defined by the National Weather Service and Technical Paper No. 40, "Rainfall Frequency Atlas of the US" May 1961 or equivalent regional rainfall probability information developed there from 24-hour Precipitation Event - Correct Answer amount of precipitation which occurs within any 24 hour period AEMA - Correct Answer Alabama Environmental Management Act, Code of Alabama 1975 Alabama Handbook - Correct Answer current edition of the Alabama Handbook for Erosion Control, Sediment Control, and Stormwater Management on Construction Sites and Urban Areas published by the Alabama Soil and Water Conservation Committee (ASWCC) at the time permit coverage is obtained ADEM - Correct Answer Alabama Department of Environmental Management Agricultural Practices - Correct Answer practices commensurate with the size of the farming operation that are implemented in a manner that meet or exceed the Natural Resources Conservation Service technical standards and guidelines, including but not limited to farm ponds that are constructed for the primary purpose of irrigation and/or watering livestock, terraces, grassed waterways, vegetative filter strips, cropland grade stabilized measures drainage tiles, underground outlets, land leveling, dike/diversion structures and other grade stabilized structures AWPCA - Correct Answer Alabama Water Pollution Control Act Best Management Practices (BMPs) - Correct Answer implementation and continued maintenance of appropriate structural and non-structural practices and management strategies to prevent and minimize the introduction of pollutants to stormwater and to treat stormwater to remove pollutants prior to discharge Borro

Content preview

Erosion and Sediment Control Test 1 Answered
Correctly
2-year, 24-hour storm even - Correct Answer maximum 24-hour precipitation event with a probable
recurrence interval of once in two years as defined by the National Weather Service and Technical Paper
No. 40, "Rainfall Frequency Atlas of the US" May 1961 or equivalent regional rainfall probability
information developed there from



24-hour Precipitation Event - Correct Answer amount of precipitation which occurs within any 24 hour
period



AEMA - Correct Answer Alabama Environmental Management Act, Code of Alabama 1975



Alabama Handbook - Correct Answer current edition of the Alabama Handbook for Erosion Control,
Sediment Control, and Stormwater Management on Construction Sites and Urban Areas published by
the Alabama Soil and Water Conservation Committee (ASWCC) at the time permit coverage is obtained



ADEM - Correct Answer Alabama Department of Environmental Management



Agricultural Practices - Correct Answer practices commensurate with the size of the farming operation
that are implemented in a manner that meet or exceed the Natural Resources Conservation Service
technical standards and guidelines, including but not limited to farm ponds that are constructed for the
primary purpose of irrigation and/or watering livestock, terraces, grassed waterways, vegetative filter
strips, cropland grade stabilized measures drainage tiles, underground outlets, land leveling,
dike/diversion structures and other grade stabilized structures



AWPCA - Correct Answer Alabama Water Pollution Control Act



Best Management Practices (BMPs) - Correct Answer implementation and continued maintenance of
appropriate structural and non-structural practices and management strategies to prevent and minimize
the introduction of pollutants to stormwater and to treat stormwater to remove pollutants prior to
discharge

, Borrow Area "Pit" - Correct Answer the activity of removing material (soil, gravel, sand) from one area
to use in another area. For the purposes of this

permit, this activity is solely in conjunction with the project requesting permit coverage and the material
is not to be sold for profit. The borrow

area and associated activity shall be located within a two-mile radius of the project requesting permit
coverage to be considered as part of the

project and will open and close with the project requesting permit coverage



Chronic and Catastrophic Precipitation - Correct Answer precipitation events which may result in failure
of the properly designed, located, implemented,

and maintained BMPs or other structure/practices required by this permit. Catastrophic precipitation
conditions means any single event of

significant total volume, or of increased intensity and shortened duration, that exceeds normally
expected or predicted precipitation over the time

period that the disturbance is planned or is ongoing, as determined by the Department. Catastrophic
conditions could also include tornadoes,

hurricanes, or other climatic conditions which could cause failure due to winds or mechanical damage.
Chronic precipitation is also that series of

wet-weather conditions over a limited time-period which does not provide any opportunity for
emergency maintenance, reinstallation, and

corrective actions and which equals or exceeds the volume of normally expected or predicted
precipitation for the time period that the disturbance

is planned or is ongoing



Common Plan of Development or Sale - Correct Answer any announcement or piece of documentation
(e.g., sign, public notice, or hearing, sales pitch,

advertisement, drawing, permit application, zoning request, computer design, etc.) or physical
demarcation (e.g., boundary signs, lot stakes,

surveyor markings, etc.) indicating construction activities may occur on a specific plot



Construction - Correct Answer any land disturbance or discharges of pollutants associated with, or the
result of building, excavation, land clearing, grubbing,

placement of fill, grading, blasting, reclamation, areas in which construction materials are stored in
association with a land disturbance or handled

Document information

Uploaded on
September 30, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lydiah247
2.2
(5)
Sold
33
Followers
11
Items
2844
Last sold
6 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions