The Contractor
Choose matching term
The method of computation of Contractor's overhead and profits for Change Order prices, where
1
both additions and deletions are involved, is found in the:
49. Specifications are:
a) Reference tools used by the Contractor in conjunction with the drawings and the agreement.
b) Technical documents describing the details of building construction for a specific project.
2
c) Legally enforceable Contract Documents that should be prepared with concern and respect for
their legal status.
d) Describe the technical requirements of the contract in a text type format.
Which of the following requires a Change Order?
a) Extension of bid date.
3
b) Modification of the Work.
c) Revision of Bidding Documents affecting construction cost.
d) Revision of Bidding Documents affecting completion time.
4
Whose responsibility is it to furnish the Shop Drawings
Don't know?
CDT practice exam
1/11
, 9/23/24, 11:26 AM
Terms in this set (59)
The method of computation of Contractor's conditions of the contract
overhead and profits for Change Order
prices, where both additions and deletions
are involved, is found in the:
General Requirements are part of: Specifications
The three essential considerations in the Requirements, Criteria, and Tests
evaluation of a product are
Whose responsibility is it to furnish the Shop The Contractor
Drawings
The division of the Work among multiple c) Division 01.
prime Contracts is described in:
a) Instructions to Bidders.
b) Supplementary Conditions.
c) Division 01.
d) Special Conditions.
During the Project Conception Stage, the d) Assist in financial feasibility studies
A/E may be retained to:
a) Develop outline specifications
b) Describe the character of the mechanical
system
c) Prepare renderings
d) Assist in financial feasibility studies
The person who becomes secondarily liable c) Guarantor
for another's debt or performance is called
the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee
What is the main purpose of MasterFormat? c) to organize the Project Manual, reference keynotes and detailed cost estimates.
a) for scheduling, value management,
recording of design data and managing
costs.
b) used during the planning stage of a
project.
c) to organize the Project Manual, reference
keynotes and detailed cost estimates.
d) when there is a standardized need for
information to appear upon each page of a
project manual.
2/11
CDT practice exam
Jeremiah
Practice questions for this set
Learn 1/7 Study with Learn
The Contractor
Choose matching term
The method of computation of Contractor's overhead and profits for Change Order prices, where
1
both additions and deletions are involved, is found in the:
49. Specifications are:
a) Reference tools used by the Contractor in conjunction with the drawings and the agreement.
b) Technical documents describing the details of building construction for a specific project.
2
c) Legally enforceable Contract Documents that should be prepared with concern and respect for
their legal status.
d) Describe the technical requirements of the contract in a text type format.
Which of the following requires a Change Order?
a) Extension of bid date.
3
b) Modification of the Work.
c) Revision of Bidding Documents affecting construction cost.
d) Revision of Bidding Documents affecting completion time.
4
Whose responsibility is it to furnish the Shop Drawings
Don't know?
CDT practice exam
1/11
, 9/23/24, 11:26 AM
Terms in this set (59)
The method of computation of Contractor's conditions of the contract
overhead and profits for Change Order
prices, where both additions and deletions
are involved, is found in the:
General Requirements are part of: Specifications
The three essential considerations in the Requirements, Criteria, and Tests
evaluation of a product are
Whose responsibility is it to furnish the Shop The Contractor
Drawings
The division of the Work among multiple c) Division 01.
prime Contracts is described in:
a) Instructions to Bidders.
b) Supplementary Conditions.
c) Division 01.
d) Special Conditions.
During the Project Conception Stage, the d) Assist in financial feasibility studies
A/E may be retained to:
a) Develop outline specifications
b) Describe the character of the mechanical
system
c) Prepare renderings
d) Assist in financial feasibility studies
The person who becomes secondarily liable c) Guarantor
for another's debt or performance is called
the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee
What is the main purpose of MasterFormat? c) to organize the Project Manual, reference keynotes and detailed cost estimates.
a) for scheduling, value management,
recording of design data and managing
costs.
b) used during the planning stage of a
project.
c) to organize the Project Manual, reference
keynotes and detailed cost estimates.
d) when there is a standardized need for
information to appear upon each page of a
project manual.
2/11