Connector pins in pendants should never be removed a . unless the pendant is under light tension b . without first removing the pendant from the crane c . until the proper lubricant has been applied d . when the pendant is under any tension - Answer-d . when the pendant is under any tension Which of the following features is necessary for a crane assembly area ? a . Soft , sandy soil for cushioning the boom sections b . Easy entry and egress for transport trucks c . Gently sloping area for assembling the boom d . Minimum of 220 VAC electrical service - Answer-b . Easy entry and egress for transport trucks Diagonal struts - Answer-In a lattice boom with a rectangular cross section , pieces of structural pipe or angle iron welded to diagonally opposite chords of the boom to stiffen the assembly . Gantry - Answer-A heavy frame with roller sheaves mounted on the upperworks of a crane , used for providing a mechanical advantage to the boom hoist ropes ; also refers to a jib strut or mast . Lattice lacing - Answer-In a lattice boom , the zig - zag pattern of structural metal supporting the main chords along the sides , top , and bottom of the boom sections . Main chords - Answer-The heavy structural pipe or angle iron members running the length of a boom section . Pendant - Answer-A length of heavy wire rope or flexibly, connected sections of flat metal bars, equipped with connectors at both ends, used to hoist and/or support sections of a crane's boom Suspension rope - Answer-The rope reeved through a crane's gantry and mast sheaves to the sheaves suspending the boom pendants Back hitch - Answer-The mechanism that permits, adjusting the position of the boom gantry to maximize its leverage on the bottom hoist cables

Content preview

NCCER Intermediate Rigging, 3rd Ed
Lattice Boom Assembly & Disassembly
Exam Questions and Answers
Connector pins in pendants should never be removed

a . unless the pendant is under light tension
b . without first removing the pendant from the crane
c . until the proper lubricant has been applied
d . when the pendant is under any tension - Answer-d . when the pendant is under any
tension

Which of the following features is necessary for a crane assembly area ?

a . Soft , sandy soil for cushioning the boom sections
b . Easy entry and egress for transport trucks
c . Gently sloping area for assembling the boom
d . Minimum of 220 VAC electrical service - Answer-b . Easy entry and egress for
transport trucks

Diagonal struts - Answer-In a lattice boom with a rectangular cross section , pieces of
structural pipe or angle iron welded to diagonally opposite chords of the boom to stiffen
the assembly .

Gantry - Answer-A heavy frame with roller sheaves mounted on the upperworks of a
crane , used for providing a mechanical advantage to the boom hoist ropes ; also refers
to a jib strut or mast .

Lattice lacing - Answer-In a lattice boom , the zig - zag pattern of structural metal
supporting the main chords along the sides , top , and bottom of the boom sections .

Main chords - Answer-The heavy structural pipe or angle iron members running the
length of a boom section .

Pendant - Answer-A length of heavy wire rope or flexibly, connected sections of flat
metal bars, equipped with connectors at both ends, used to hoist and/or support
sections of a crane's boom

Suspension rope - Answer-The rope reeved through a crane's gantry and mast sheaves
to the sheaves suspending the boom pendants

Back hitch - Answer-The mechanism that permits, adjusting the position of the boom
gantry to maximize its leverage on the bottom hoist cables

, Belly lines - Answer-Additional pendants attached to the boom hoisting bail, and
secured at a location near the midpoint of a long boom to minimize stagging

Boom stops - Answer-Devices that mechanically prevent the boom from exceeding a
maximum boom angle, reducing the potential for backward tipping or structural damage

Cantilever length - Answer-The length of a horizontal boom that projects beyond the
support of the boom pendants, leaving the portion of the boom, supported at only one
and like a __________________.

Hoist kick - out - Answer-A term for any safety device that automatically stops a hoist
drum when a limit is reached

Live boom mast - Answer-A heavy framework or lattice, boom, with sheaves hinged at
the lower end of its base on the cranes upperworks, whose purpose is to control the
angle of the main boom through attached boom pendants. Boom hoist cables reeved
through the boom gantry sheaves or hydraulic actuators control its position

All the following actions are appropriate when preparing to assemble a lattice boom
except

a . extending and locking outriggers to their maximum extent
b . removing the crawler assemblies
c . erecting the gantry and boom mast rigging
d . extending a crane's extendable counter weight - Answer-b . removing the crawler
assemblies

The maximum cantilever length of a lattice boom is the maximum

a . length of a luffing jib
b . load chart radius of the boom
c . length of a lowered boom beyond the pendants
d . boom length permitted by the manufacturer - Answer-c . length of a lowered boom
beyond the pendants

When installing a jib on a lattice boom , attach ing the jib may require a

a . belly line
b . jib adapter
c . diagonal strut
d. back hitch assembly - Answer-b . jib adapter

Which boom connector pins are removed first during disassembly ?

a . Lower pins

Document information

Uploaded on
September 16, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectknancy
3.8
(82)
Sold
342
Followers
27
Items
26160
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions