• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

Mobile Crane Review Exam Questions with Correct Answers

Document preview thumbnail
Preview 3 out of 20 pages

What is the purpose of placing mats or cribbing under or cribbing under outrigger floats? - Answer-Distribute the force over a larger area. Where is the best location for leveling a crane? - Answer-Upperworks. (A revolving frame of equipment on which operating machinery are mounted along operator's can) Before leveling a mobile crane on outriggers, an operator should ensure: - Answer-There is no weight of the crane bearing on any tires. Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - Answer-Keeping a 90 degree angle between cylinder rod and pad. When may blocking (cribbing) be placed under outrigger beams on mobile cranes? - Answer-Never approved. Mobile cranes should be level to within what percent of grade? - Answer-1 % Timber crane mats work best when they are: - Answer-Bolted together When arriving in the crane at the job site, the operator should first determine the condition of the: - Answer-Access roads What surface listed below would Not be a good location for assembly or setup of a mobile crane? - Answer-A. Above compacted fill B. Above highway asphalt C. Above underground vaults D. Above highway concrete Each outrigger pad and its blocking should be sufficient to support? - Answer-The total weight of the crane and its load. How does high wind affect a mobile crane with a long boom? - Answer-Introduces side load onto the boom When is the only time the outrigger beams should be less than fully extended? - Answer-The load chart indicates that this is allowed (always make sure that it is safe first) What is the primary purpose for a rooster sheave or auxiliary boom point sheave? - Answer-separate the load hoist lines.

Content preview

Mobile Crane Review Exam Questions
with Correct Answers
What is the purpose of placing mats or cribbing under or cribbing under outrigger floats?
- Answer-Distribute the force over a larger area.

Where is the best location for leveling a crane? - Answer-Upperworks. (A revolving
frame of equipment on which operating machinery are mounted along operator's can)

Before leveling a mobile crane on outriggers, an operator should ensure: - Answer-
There is no weight of the crane bearing on any tires.

Operating a mobile crane with a long boom, on uneven ground, what support condition
should be considered? - Answer-Keeping a 90 degree angle between cylinder rod and
pad.

When may blocking (cribbing) be placed under outrigger beams on mobile cranes? -
Answer-Never approved.

Mobile cranes should be level to within what percent of grade? - Answer-1 %

Timber crane mats work best when they are: - Answer-Bolted together

When arriving in the crane at the job site, the operator should first determine the
condition of the: - Answer-Access roads

What surface listed below would Not be a good location for assembly or setup of a
mobile crane? - Answer-A. Above compacted fill
B. Above highway asphalt
C. Above underground vaults
D. Above highway concrete

Each outrigger pad and its blocking should be sufficient to support? - Answer-The total
weight of the crane and its load.

How does high wind affect a mobile crane with a long boom? - Answer-Introduces side
load onto the boom

When is the only time the outrigger beams should be less than fully extended? -
Answer-The load chart indicates that this is allowed (always make sure that it is safe
first)

What is the primary purpose for a rooster sheave or auxiliary boom point sheave? -
Answer-separate the load hoist lines.

,Eccentric main boom tip reeving causes which of the following: - Answer-twisting of the
main boom

which type of wire rope listed below is installed on MOST cranes?

a. right regular lay
b. right alternate lay
c. left regular lay
d. left alternate lay - Answer-a. right regular lay

The hoist drum flange shall extend a minimum of _______ over the top layer of wire
rope at all times while crane is in operation.

a. 1/2 inch
b. 1 inch
c. 1 1/2 inch
d. 2 inch - Answer-1/2 inch

Which type of wire rope listed below is installed on most cranes?

a. main hoist line
b. boom hoist line
c. Auxiliary hoist line
d. pendant line - Answer-pendant line

when lifting on outriggers, the floats or pads should always be:

a. sufficient to support three times the applies load
b. raised to touch the tires firmly on the ground
c. secured to the outriggers cylinder
d. secured to the mats - Answer-secured to the outriggers cylinder

on a mobile crane, how many broken wires are permitted at the connection of a pendant
before it must be taken out of service?

a. 6
b. 5
c. 3
d. 1 - Answer-1

How many randomly broken wires in a lay length must there be on a mobile cranes
hoist line, before it should be removed from service?

a. 4
b. 3

, c. 5
d. 6 - Answer-6

what is the minimum design (unless rotation resistant) factor required for a right regular
lay, boom or hoist wire rope?

a. 5
b. 3.5
c. 2.5
d. 7 - Answer-3.5

Type 1 rotation resistant hoist wire rope has a design factor of:

a. 2.5 to 1
b. 3 to 1
c. 3.5 to 1
d. 5 to 1 - Answer-5 to 1

it is important to know when lubricating crane hoist wire rope, that the lubricant must:

a. not hinder visual inspection
b. not be applied in direct sunlight
c. not be applied prior to use
d. not be applied to regular lay wire rope - Answer-not hinder visual inspection

how often is the competent person required to inspect the running wire ropes on a
mobile wire?

a. each shift
b. each year
c. each week
d. each month - Answer-each shift

On mobile cranes, how many broken wires must be present in one strand of one lay for
running wire rope removed from service?
A. 3
B. 1
C. 2
D. 0 - Answer-3

How many randomly distributed broken wires in rotation-resistant hoist wire ropes
considered for replacement?

A. 1 broken wire in 6 rope diameters
B. 2 broken wires in 30 rope diameters
C. 3 broken wires in one strand in one lay

Document information

Uploaded on
September 16, 2024
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectknancy
3.8
(82)
Sold
342
Followers
27
Items
26160
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions