• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

MOT Exam (LTAP) UPDATED Actual Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 8 pages

MOT Exam (LTAP) UPDATED Actual Exam Questions and CORRECT Answers Erect _____________ sign 250' in advance of any section of roadway where traffic must travel on a planed surface. - CORRECT ANSWER- Grooved Pavement (CMS 2019, section 614.055) Furnish cones, drums, signs, sign support, barricades, and other traffic control devices that are certified to meet _____________. - CORRECT ANSWER- NCHRP 350 (CMS 2019, Section 614.03)

Content preview

MOT Exam (LTAP) UPDATED Actual
Exam Questions and CORRECT Answers
Erect _____________ sign 250' in advance of any section of roadway where traffic must
travel on a planed surface. - CORRECT ANSWER- ✔✔Grooved Pavement (CMS 2019,
section 614.055)


Furnish cones, drums, signs, sign support, barricades, and other traffic control devices that
are certified to meet _____________. - CORRECT ANSWER- ✔✔NCHRP 350 (CMS 2019,
Section 614.03)


(T/F) Escort transport vehicles without proper strobe lights, LED warning lights or rotating
beacons or conspicuity tape to and from the work zone only with the approval of the Engineer
- CORRECT ANSWER- ✔✔True (CMS 2019, section 614.11)


Repair or replace unsatisfactory markings immediately and at no additional cost to the
department, if the marking were in place for __________ days or less. - CORRECT
ANSWER- ✔✔120 calendar days (CMS 2019, section 614.11)


All barriers segments are to be marked on the top, as shown, PCB-Rxx-350-TL3. What does
the xx stand for? - CORRECT ANSWER- ✔✔it will indicate the year casted


The contractor shall select one of the three acceptable options for terminating portable
barriers. - CORRECT ANSWER- ✔✔Refer to NOTE ITEMS #3 a), b), and c)


Cones used for night time traffic control shall have a minimum height of ____________? -
CORRECT ANSWER- ✔✔42" (Drums/Cones, section 13B)


For construction of temporary walkways, the maximum grade shall be _____________ unless
specified otherwise? - CORRECT ANSWER- ✔✔5% (MT110.10 (5B))


____________________ shall be used to protect pedestrians from thrown object from
passing vehicle? - CORRECT ANSWER- ✔✔Plywood Walls ( MT-110.10 (7E))

, Temporary sign support requirements, Class B supports shall be used at the following
locations _________________ - CORRECT ANSWER- ✔✔Within the clear zone where
protected by guardrail or concrete barrier or retaining wall/ or outside the clear zone (MT-
105.10, Class B, (a) & (g))


Class A supports are fixed to the top of portable barrier by ______________? - CORRECT
ANSWER- ✔✔Set screws (MT-105.1)


What is the merging taper rate minimum for a 55 mph speed limit? - CORRECT ANSWER-
✔✔55:1 (MT-95.40, Table II)



How are portable barriers terminated? - CORRECT ANSWER- ✔✔Shall be terminated on
the paved shoulder if the cross-slope is greater than 10:1 (MT-94.40, 14a-14j)


Use of cones at night shall be ________________ along tapers? - CORRECT ANSWER-
✔✔This is prohibited


Drum spacing along a Two-way traffic taper shall be ______________ center to center? -
CORRECT ANSWER- ✔✔10' (MT-96.11 (a) drums/cones)


What retroreflective surface should an attenuator nose (without stripes) have? - CORRECT
ANSWER- ✔✔Solid fluorescent yellow (MT-101.70)


Spacing of a barrier reflector without a glare screen shall be _____________? - CORRECT
ANSWER- ✔✔50' maximum center to center, Top-mounted object markers (6"x12") at 50'
maximum, Barrier reflectors and object markers to be alternated at 25' spacing (MT-101.70)


Portable barrier glare screen panels? - CORRECT ANSWER- ✔✔Glare screen delineation
are vertical stripes. Vertical stripes ae Type G, H, or J (2'x12"). They shall be placed in groups
of 3, on adjacent paddles at 50' center to center (MT-101.70)


What protection is needed for a 10" drop-off in a work zone? - CORRECT ANSWER-
✔✔refer to MT-101.90 Condition 2

Document information

Uploaded on
September 15, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(241)
Sold
1681
Followers
109
Items
121806
Last sold
4 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions