Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Document preview thumbnail
Preview 2 out of 5 pages

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Content preview

Construction Jobsite Management 4th Edition By
William R. Mincks; Hal Johnston Solutions Manual

Traditional system of construction management is also named in the text as -
ANSWER: Design-Bid-Build

The text refers to four basic project delivery systems - ANSWER: design build,
design-bid-build,
cm agency,
and cm at risk

The three primary contractual principal parties involved are the: - ANSWER: owner,
architect, and contractor

The texts lists several bidding procedures and contracts for CMs to obtain work. List
three: - ANSWER: competitive, negotiated, unit price

The contract documents can be broken down many different ways. The text breaks
them down into two major components: - ANSWER: project manual and
construction drawings

How does the book define the word addenda: - ANSWER: bulletins of additional
information that germane to the contract documents issued during the bid period

What division is the AIA A201 form found in, and what purpose does it serve? -
ANSWER: General conditions; it establishes the relationships, responsibilities, and
legal terms between parties

The technical specifications include divisions 2-16, list half of the divisions: -
ANSWER: 02 sitework
03 concrete
04 masonry
05 metals
06 woods, plastics, and composites
07 thermal and moisture protection
08 openings
09 finishes
10 specialties

There are several different uses for submittals on a jobsite. Which of the following is
not considered one of the 5 uses for submittals during the construction process? -
ANSWER: Cost schedule and contractual payment obligations for materials

Which of the following items is a factor that applies to determining the necessary
time frame for approval of submittals? - ANSWER: All of the above (complexity of the

, submittal, size of the submittal package, number of consultants reviewing a
submittal)

T/f shop drawings are the set of drawings prepared by the architect or owner for the
contractor to supply materials. - ANSWER: false

After subcontracts and purchase orders are completed, who is the first person to
review a submittal once they are submitted? - ANSWER: The general contractor

t/f when reviewing submittals, the engineer is permitted to add or delete any
information as necessary - ANSWER: TRUE:

List three of the six keys to effective jobsite documentation and communication: -
ANSWER: truthfulness, timeliness, distribution, uniformity, completeness, and
objectivity

List the six primary areas which need to be covered by documents? - ANSWER:
Events, conversations, costs, correspondence, contractual requirements, and
meeting minutes

Which of the following statements is not true about RFIs? - ANSWER: Phone
conversations are an acceptable way to send RFIs

Which of the following items is not one of the five main elements in the
documentation of a correspondence between parties? - ANSWER: None of the above
(reference to project name, description and location of the subject, summary of
correspondence, signature)

t/f pre printed forms are not useful tools for a construction jobsite office because
each job is unique. - ANSWER: false

With respect to jobsite meetings, all of the following are considered guidelines for
what should be recorded expect: - ANSWER: note of upcoming holidays (these
should be included: agenda and meeting minutes, list of attendees, review of work
done on site, and safety related events/concerns on site)

Which of the following general contractor personnel will not typically attend a
jobsite construction progress meeting? - ANSWER: Estimator (these people will:
superintendent, field engineer, project manager, and foreman)

t/f specialized meetings happen more frequently than other meetings, because they
are generally less time consuming and involve simple answer. - ANSWER: false

According to the book, pre-job planning involves 5 major organization sections. List
below: - ANSWER: review staffing requirements, review of the estimate/estimators
intent, development of the construction plan/prelim schedule, project safety

Connected book
 image
William Mincks, Hal Johnston Construction Jobsite Management
Edition: 2016 ISBN: 9781305081796 Edition: Unknown

Document information

Uploaded on
September 14, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
1282
Last sold
10 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions