SAP S/4HANA Full List (TS410 Exam) | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
SAP S/4HANA Full List (TS410 Exam) | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ What are the scope of a planning run? - Answer --Regenerative Planning -Net Change for Total Horizon What is the purpose of Material Ledger? - Answer --the elimination of locking and increase throughput for standard pricing for material valuation -improved and flexible valuation methods in multiple currencies and parallel accounting What is the output of an MRP run? - Answer --Planned Order -Purchase Req for Dependent Requirements -Reservation for Dependent Items What is the master data need for Adv. Planning? - Answer -- Location - Product - ResourceList the Options for Running MRP? - Answer -- Total Planning - Single Item Planning Multilevel - Single Item Planning Single Level - Single Item Planning Interactive What is the difference between the stock requirements list and the MRP list? - Answer -Stock Req - Real Time / Dynamic MRP List - Static / Frozen What is the difference between MRP and Consumption Based Planning? - Answer -MRP - planned on requirements (future, current, forecast) CBP - planning on historical data (historical) What does a work center control? - Answer -Standard Values Scheduling
Written for
- Institution
- SAP
- Module
- SAP
Document information
- Uploaded on
- September 12, 2024
- Number of pages
- 39
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
sap s4hana full list ts410 exam 2024
-
sap s4hana full list ts410 exam 2025
-
what are the scope of a planning run answer r
Also available in package deal