PROGRESSION CONSTRUCTION COORDINATOR II - III 2024 ACTUAL EXAM COMPLETE 110 QUESTIONS AND CORRECT DETAILED ANSWERS 100% CORRECT

Rating
-
Sold
-
Pages
53
Grade
A+
Uploaded on
11-09-2024
Written in
2024/2025

The NESC National Electrical Safety Code requires drop cables to be placed at what minimum depth? 6 inches. 12 inches. 22 inches. 18 inches. - CORRECT ANSWER ️ 18 inches. When troubleshooting RFoGRadio frequency over glass and PONPassive optical network FTTx systems that use longer wavelengths, what is the common cause of higher losses that should be addressed?

Show more Read less
Institution
PROGRESSION CONSTRUCTION COORDINATOR II - III
Course
PROGRESSION CONSTRUCTION COORDINATOR II - III











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PROGRESSION CONSTRUCTION COORDINATOR II - III
Course
PROGRESSION CONSTRUCTION COORDINATOR II - III

Document information

Uploaded on
September 11, 2024
Number of pages
53
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PROGRESSION CONSTRUCTION
COORDINATOR II - III 2024 ACTUAL EXAM
COMPLETE 110 QUESTIONS AND CORRECT
DETAILED ANSWERS 100% CORRECT How
should the buffer tubes be secured in the closu

The NESC National Electrical Safety Code requires drop
cables to be placed at what minimum depth?

6 inches.
12 inches.
22 inches.
18 inches. - CORRECT ANSWER ✔️ 18 inches.

When troubleshooting RFoGRadio frequency over glass
and PONPassive optical network FTTx systems that use
longer wavelengths, what is the common cause of higher
losses that should be addressed?

Intermixing multimode and single-mode jumpers.
The reflectivity of optical attenuators.
Transmitter fiber allocations.
Macrobends and microbends are caused by improper
bending and pinching of cables and patch cords. -
CORRECT ANSWER ✔️ Macrobends and microbends

,are caused by improper bending and pinching of cables
and patch cords.

Who is responsible for compiling the physical document of
the restoration plan?

External contractors hired for restoration work.
An identifiable position or group within an organization.
Any available employee in the organization.
Customers or users of the network. - CORRECT
ANSWER ✔️ An identifiable position or group within an
organization.

What can happen inside fiber-optic equipment room
facilities?

Failures can typically arise at patch panels, in
optoelectronic systems, and due to installation practices.
Card failure and too much or too little optical power are
rarely the causes of total or intermittent failure.
Excessive failure rates on all transmitter and receiver
cards should be ignored and only addressed by a field
technician.
Installation-related failure occurs exclusively in electronics
shelves and nodes and has little to do with craftsmanship
issues. - CORRECT ANSWER ✔️ Failures can typically

,arise at patch panels, in optoelectronic systems, and due
to installation practices.

How is a restoration posture for a fiber network
developed?

All personnel must complete industry-accepted fiber-optic
training before any restoration planning can begin.
First, developing an emergency restoration plan and then
having each organization review its resources.
Creating fiber assignments where all are identified
generically and can be restored in the most accessible
order rather than by any prioritizing scheme.
Including the resources required to respond to a significant
system outage, such as documentation, technical skills,
and essential troubleshooting and repair equipment and
materials. - CORRECT ANSWER ✔️ Including the
resources required to respond to a significant system
outage, such as documentation, technical skills, and
essential troubleshooting and repair equipment and
materials.

What is the best way to structure a flowchart of basic
restoration activities?

Ensure the permanent repair always precedes the
troubleshooting step.

, Allow each organization to create a flow diagram to be
included in the restoration plan.
Make a detailed list of all the equipment and required
materials.
Diagram the events following an actual fiber interruption. -
CORRECT ANSWER ✔️ Diagram the events following an
actual fiber interruption.

What is true when establishing a timing sequence or
communication flow for a restoration flow chart?

The purpose of sequence time planning is to increase the
overall restoration time.
Restoration sequence time charts are initially based on a
vast amount of data.
One person from one department should expand on some
essential activity blocks or groups of blocks.
As experience in emergency restoration deployment is
gained through actual deployments or rehearsals, the
sequence time chart becomes more detailed and realistic.
- CORRECT ANSWER ✔️ As experience in emergency
restoration deployment is gained through actual
deployments or rehearsals, the sequence time chart
becomes more detailed and realistic.

After identifying the basic restoration activities, what is the
next helpful restoration planning component?

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
tevstudy234 Chamberlian School of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
9
Member since
2 year
Number of followers
6
Documents
768
Last sold
3 months ago
TELVIN

The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3.0

3 reviews

5
0
4
2
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions