Mass Hoisting Test questions and answers A+
Rated
-What is the purpose of the swing gear on an excavator - -It connects the
car body to the tracks
-Who is responsible for inspecting a trench before anyone goes in it - -The
equipment operator
-What is the preferred sling angle of these angles?
60 degrees
45 degrees
30 degrees - -60 degrees
-The top of the spoil pile is called - -Crown
-A four foot deep trench requires an additional ladder for every _______of
open trench - -25 feet
-Materials must be kept back from the edge of the trench a minimum of - -
Two feet
-When can an inspector revoke a hoisting license - -For failure to pay excise
tax
-Who developed the massachusets crane hand signals - -American National
standards instatute /American society mechanical engineers
-DOT stands for - -Department of transportation
-When do you do your walk around of the equipment - -Before you start it
-In the one to 1 sloping ratio what does the second one represent - -Depth
or vertical rise
-On a track machine the gears should be where - -In the rear
-When load leveling when do you deploy your stabilizes or load levelers
before or after you make the lift - -Before you make your lift
-When backfilling an excavation you should use a - -Small lift shade the
ditch
, -In the state of Massachusetts what criteria require a hoisting license - -The
weight of the load exceeds 500 pounds the height of the load exceeds 10
feet the capacity of the bucket exceeds 1/4 cubic yard
-What type of safety system is used on de energized circuits - -Lockout
tagout total de energization system
-In what time frame must the department of Public Safety be notified of a
death involving hoisting equipment - -Within 1 hour
-How many pounds in a ton - -2,000lbs
-All welding and cutting on hoisting equipment shall be done in accordance
with the requirements of what? - -American welding society formerly of the
American Society of mechanical engineers
-What action dose the signal person intend the operator perform if he
extends his arm at shoulder height, makes a fist with his hand and sticks his
thumb up - -Boom up
-What type of protection should be given to operators of material handling
and moving equipment - -Protection from the weather safety shatter proof
glass heat in cold weather overhead protection
-What law governs hoisting equipment in the state of Massachusetts - -
Chapter 146 of the general laws 520 CMR section 6
-How do you test the load brake on a LULL - -Lift the load just off the ground
and return the boom handle to neutral position
-How do you find the weight of a load - -Shipping papers data tags use a
scale to weigh load calculate the weight
-What must be stamped on all load rating plates - -Serial number of the
lifting unit
-The boom of the unit you are operating comes in contact with and
energized power line there's no sign of any other dangers such as fire what
should you do - -Stay in the cab until the lines are de-energized
-Can you prohibit the Department of Public Safety from your premises - -No
-Before digging anywhere who do you call and how much notice must you
give - -Dig safe 72 hours 3 days minimum 30 days maximum
Rated
-What is the purpose of the swing gear on an excavator - -It connects the
car body to the tracks
-Who is responsible for inspecting a trench before anyone goes in it - -The
equipment operator
-What is the preferred sling angle of these angles?
60 degrees
45 degrees
30 degrees - -60 degrees
-The top of the spoil pile is called - -Crown
-A four foot deep trench requires an additional ladder for every _______of
open trench - -25 feet
-Materials must be kept back from the edge of the trench a minimum of - -
Two feet
-When can an inspector revoke a hoisting license - -For failure to pay excise
tax
-Who developed the massachusets crane hand signals - -American National
standards instatute /American society mechanical engineers
-DOT stands for - -Department of transportation
-When do you do your walk around of the equipment - -Before you start it
-In the one to 1 sloping ratio what does the second one represent - -Depth
or vertical rise
-On a track machine the gears should be where - -In the rear
-When load leveling when do you deploy your stabilizes or load levelers
before or after you make the lift - -Before you make your lift
-When backfilling an excavation you should use a - -Small lift shade the
ditch
, -In the state of Massachusetts what criteria require a hoisting license - -The
weight of the load exceeds 500 pounds the height of the load exceeds 10
feet the capacity of the bucket exceeds 1/4 cubic yard
-What type of safety system is used on de energized circuits - -Lockout
tagout total de energization system
-In what time frame must the department of Public Safety be notified of a
death involving hoisting equipment - -Within 1 hour
-How many pounds in a ton - -2,000lbs
-All welding and cutting on hoisting equipment shall be done in accordance
with the requirements of what? - -American welding society formerly of the
American Society of mechanical engineers
-What action dose the signal person intend the operator perform if he
extends his arm at shoulder height, makes a fist with his hand and sticks his
thumb up - -Boom up
-What type of protection should be given to operators of material handling
and moving equipment - -Protection from the weather safety shatter proof
glass heat in cold weather overhead protection
-What law governs hoisting equipment in the state of Massachusetts - -
Chapter 146 of the general laws 520 CMR section 6
-How do you test the load brake on a LULL - -Lift the load just off the ground
and return the boom handle to neutral position
-How do you find the weight of a load - -Shipping papers data tags use a
scale to weigh load calculate the weight
-What must be stamped on all load rating plates - -Serial number of the
lifting unit
-The boom of the unit you are operating comes in contact with and
energized power line there's no sign of any other dangers such as fire what
should you do - -Stay in the cab until the lines are de-energized
-Can you prohibit the Department of Public Safety from your premises - -No
-Before digging anywhere who do you call and how much notice must you
give - -Dig safe 72 hours 3 days minimum 30 days maximum