• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Ccs Construction Specifiers Exam

Document preview thumbnail
Preview 2 out of 6 pages

CCS CONSTRUCTION SPECIFIERS EXAM

Content preview

CCS CONSTRUCTION SPECIFIERS EXAM
Name 5 documents included in the Project Manual?




- Answers -1. Specifications
2. Contracting forms
3. Conditions of the Contract
4. Bid Requirements

True or False: Addenda and modifications are difficult to add to the bound project
manual and are often compiled in a separate volume. - Answers -TRUE

Project Manual Arrangement: In which section can the project title page, certifications
page, seals page, table of contents, list of drawings and list of schedules be found? -
Answers -INTRODUCTORY INFO

Project Manual Arrangement: In which section can solicitation, advertisement for bids,
instructions for bidders, supplementary instructions to bidders, available information,
preliminary schedules, geotech report, existing conditions info, bid forms, proposal
forms, bid form supplements and representations and certifications be found? - Answers
-BID (PROCUREMENT) REQUIREMENTS

Project Manual Arrangement: In which section can contract forms, agreement forms,
project forms, bond forms, certificates and forms, contract conditions, general and
supplementary conditions be found? - Answers -CONTRACT REQUIREMENTS

Project Manual Arrangement: In which section can General requirements, facility
construction and services, site and infrastructure and process equipment be found? -
Answers -SPECS

Project Manual Arrangement: List the 4 main organizational sections of the Project
Manual. - Answers -Intro, bid requirements, contract requirements and specs.

Developing Specs: Gathering Info- What two types of info are needed before the spec
writer begins writing a section of specs? - Answers -1. Specific project requirements

, 2. Reference material related to products and construction methods applicable to the
spec section.

Developing Specs: Product Selection Decisions - All product selections should be
_________ and the architect must direct or be made aware of product selections. -
Answers -RECORDED

Developing Specs: Product Selection- Name 4 factors to consider when evaluating a
product. - Answers -1. Product
2. Manufacturer
3. How is it installed?
4. How much does it cost- initial and operational?

Developing Specs: Product Selection- Name 5 methods for assembling and recording
spec info. - Answers -1. Notes/ Emails
2. Notebook
3. Checklist
4. Preliminary product description (PPD)
5. Outline specs

Spec Organization and Prep: Basic Decisions - Before a specifier can begin editing or
writing specs, the_____and ______ must be established. - Answers -TYPE and
ORGANIZATION

Spec Organization and Prep: Basic Decisions - The ______ published by the EJCDC is
a useful reference for coordinating parts of cds. For each subject that might be included
in the cds, the recommended primary location, as well as any secondary locations for
info is provided. - Answers -THE UNIFORM LOCATION OF SUBJECT MATTER

Spec Organization and Prep: Format - Info collected should be developed in the 3
part_____. - Answers -SECTION FORMAT

Spec Organization and Prep: Methods of Specifying - What are the 3 methods of
specifying? - Answers -1. describe
2. perform
3. ref standard
4. proprietary

Methods of Specifying: TRUE or FALSE: The specifier should be careful about
combining methods of specifying in the specification of a single product, because this
can be redundant and can result in a conflict. - Answers -TRUE

Spec Organization and Prep: Language - What are the 4 principles of effective
communication? - Answers -1. Clear
2. Concise
3. Correct

Document information

Uploaded on
September 6, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(380)
Sold
2244
Followers
1452
Items
64014
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions