False-fail result - answer-test result - defect reported but no defect exists in test object Error - Mistake - answer-Human action produces an incorrect result Defect (bug, fault) - answer-Flaw in a component or system causing component or system to fail to perform required function. Failure - answer-Deviation of the component or system from its expected delivery, service or result. Quality - answer-The degree to which a component, system or process meets specified requirements and/or user/customer needs and expectations. Risk - answer-A factor that could result in future negative consequences; usually expressed as impact and likelihood. False-pass result - answer-A test result which fails to identify the presence of a defect that is actually present in the test object. Testing - answer-Also know as evaluation. The process consisting of all life-cycle activities both static and dynamic, concerned with planning, preparation, and evaluation of software products and related work products to determine that they are fit for purpose and to detect defects. Requirement - answer-A condition or capability needed by a user to solve a problem or achieve an objective that must be met or possessed by a system or system component to satisfy a contract, standard, specification, or other formally imposed document. Review - answer-An evaluation of a product or project status to ascertain discrepancies from planned results and to recommend improvements. Examples include management review, informal review, technical review, inspection, and walkthrough. Debugging - answer-The process of finding, analyzing, and removing the causes of failures in software. Confirmation testing (re-testing) - answer-Testing that runs test cases that failed the last time they were run, in order to verify the success of corrective actions. Test Strategy - answer-A high-level description of the test levels to be performed and the testing within those levels for an organization or program (one or more projects) Test Execution - answer-The process of running a test on the component or system under test, producing actual results Test approach - answer-The implementation of the test strategy for a specific project. Test Plan - answer-A document describing the scope, approach, resources, and schedule of intended test activities. It identifies among others test items, the features to be tested, the testing tasks, who will do each task, degree of test independence, the test environment, the test design techniques, and entry an exit criteria to be used, and the rationale for their choice, and any risks requiring contingency planning. It is a record of the test planning process. Test monitoring - answer-A test management task that deals with the activities related to periodically checking the status of a test project. Reports are prepared that compare the actuals to that which was planned. Test condition - answer-An item or event of a component or system that could be verified by one or more test cases, e.g. A function, transaction, feature, quality attribute, or structural element. Test basis - answer-All documents from which the requirements of a component or system can be inferred. The documentation on which the test cases are based. If a document can be amended only by way of formal amendment procedure, then the test basis is called a frozen test basis. Test Data - answer-Data the exists before a test is executed, and that affects or is affected by the component or system under test. Example - in a database Coverage (test coverage) - answer-The degree, expressed as a percentage, to which a specified coverage item has been exercised by a test suite. Test procedure specification (test procedure, test script, manual test script) - answer-A document specifying a sequence of actions for the execution of a test. Test Suite - answer-A set of several test cases for a component or system under test, where the post condition of one test if often used as the precondition for the next one. Incident - answer-Also known as deviation. Any event occurring that requires investigation. Testware - answer-Artifacts produced during the test process required to plan, design, and execute tests, such as documentation, scripts, inputs, expected results, set-up, and clear-up procedures, files, databases, environment, and any additional software or utilities used in testing. Regression testing - answer-Testing of a previously tested program following modification to ensure that defects have not been introduced or uncovered in unchanged areas of the software, as a result of the changes made. It is performed when the software or its environment is changed. Exit Criteria - answer-The set of generic and specific conditions, agreed upon with the stakeholders, for permitting a process to be officially completed. The purpose of exit criteria is to prevent a task from being considered completed when there are still outstanding parts of the task that have not been finished. Exit criteria are used to report against and to plan when to stop testing. Test log - answer-A chronological record of relevant details about the execution of tests. Test summary report - answer-A document summarizing testing activities and results. It is also contains an evaluation of the corresponding test items against exist criteria. Error Guessing - answer-A test design technique where the experience of the test is used to anticipate what defects might be present in the component or system under test as a result of errors made, and to design tests specifically to expose them. Independence of testing - answer-Separation of responsibilities, which encourages the accomplishment of objective testing Test policy - answer-A high level document describing the principles, approach, and major objectives regarding testing. Verification - answer-Confirmation by examination and through provision of objective evidence that specified requirements have been fulfilled. Validation - answer-Confirmation by examination and through provision of objective evidence that the requirements for a specific intended use or application have been fulfilled. V-model - answer-A framework to describe the software development lifecycle activities from requirements specification to maintenance. The V-model illustrates how testing activities can be integrated into each phase of the software development lifecycle. Test level - answer-A group of test activities that are organized and managed together. A test level is linked to the responsibilities in a project. Examples of test levels are component test, integration test, system test, and acceptance test. Integration - answer-The process of combining components or systems into larger assemblies. Off-the-shelf software (commercial off-the-shelf software, COTS) - answer-A software product that is developed for the general market, i.e. For a large number of customers, and that is delivered to many customers in identical format. Performance - answer-The degree to which a system or component accomplishes its designated functions within given constraints regarding processing time and throughput rate. Incremental development model - answer-A development lifecycle where a project is broken into a series of increments, each of which delivers a portion of the functionality in the overall project requirements. The requirements are prioritized and delivered in priority order in the appropriate increment. In some but not all versions of this lifecycle model, each subproject follows a "mini V-model" with its own design, coding, and testing phases. Iterative development model - answer-A development lifecycle where a project is broken into a usually large number of iterations. An iteration is a complete development loop resulting in a release (internal or external) of an executable product, a subset of the final product under development, which grows from iteration to iteration to become the final product. Agile software development - answer-A group of software development methodologies based on iterative incremental development., where requirements and solutions evolve through collaboration between self-organizing cross-functional teams. Agile manifesto - answer-A statement on the values that underpin agile software development. The values are: individuals and interactions over processes and tools; working software over comprehensive documentation; customer collaboration over contract negotiation; responding to change over following a plan. Efficiency testing - answer-The process of testing to determine the efficiency of a software product. Component testing (unit testing, module testing) - answer-The testing of individual software components. Synonym to program testing. Stub - answer-A skeletal or special-purpose implementation of a software component, used to develop a that calls or is otherwise dependent on it. It replaces a called component. Driver (test driver) - answer-A software component or test tool that replaces a component that takes care of the control and/or the calling of a component or system. Robustness testing - answer-Testing to determine the robustness of the software product. Test-driven development - answer-A way of developing software where the test cases are developed, and often automated, before the software is developed to run those test cases. Integration testing - answer-Testing performed to expose defects in the interfaces and in the interactions between integrated components or systems. System testing - answer-The process of testing an integrated system to verify that it meets specified requirements. Functional requirement - answer-A requirement that specifies a function that a component or system must perform. Non-functional requirement - answer-A requirement that does not relate to functionality, but to attributes such as reliability, efficiency, usability, maintainability, and portability. Test environment (test bed) - answer-An environment containing hardware, instrumentations, simulators, software tools, and other support elements needed to conduct a test. Acceptance testing (acceptance, user acceptance testing) - answer-Formal testing with respect to user needs, requirements, and business processes conducted to determine whether or not a system satisfies the acceptance crite

Voorbeeld van de inhoud

STQB FOUNDATION LEVEL EXAM
False-fail result - answer-test result - defect reported but no defect exists in test object

Error - Mistake - answer-Human action produces an incorrect result

Defect (bug, fault) - answer-Flaw in a component or system causing component or system to fail to
perform required function.

Failure - answer-Deviation of the component or system from its expected delivery, service or result.

Quality - answer-The degree to which a component, system or process meets specified requirements
and/or user/customer needs and expectations.

Risk - answer-A factor that could result in future negative consequences; usually expressed as impact and
likelihood.

False-pass result - answer-A test result which fails to identify the presence of a defect that is actually
present in the test object.

Testing - answer-Also know as evaluation. The process consisting of all life-cycle activities both static
and dynamic, concerned with planning, preparation, and evaluation of software products and related work
products to determine that they are fit for purpose and to detect defects.

Requirement - answer-A condition or capability needed by a user to solve a problem or achieve an
objective that must be met or possessed by a system or system component to satisfy a contract, standard,
specification, or other formally imposed document.

Review - answer-An evaluation of a product or project status to ascertain discrepancies from planned
results and to recommend improvements. Examples include management review, informal review,
technical review, inspection, and walkthrough.

Debugging - answer-The process of finding, analyzing, and removing the causes of failures in software.

Confirmation testing (re-testing) - answer-Testing that runs test cases that failed the last time they were
run, in order to verify the success of corrective actions.

Test Strategy - answer-A high-level description of the test levels to be performed and the testing within
those levels for an organization or program (one or more projects)

Test Execution - answer-The process of running a test on the component or system under test, producing
actual results

Test approach - answer-The implementation of the test strategy for a specific project.

Test Plan - answer-A document describing the scope, approach, resources, and schedule of intended test
activities. It identifies among others test items, the features to be tested, the testing tasks, who will do
each task, degree of test independence, the test environment, the test design techniques, and entry an exit

,criteria to be used, and the rationale for their choice, and any risks requiring contingency planning. It is a
record of the test planning process.

Test monitoring - answer-A test management task that deals with the activities related to periodically
checking the status of a test project. Reports are prepared that compare the actuals to that which was
planned.

Test condition - answer-An item or event of a component or system that could be verified by one or more
test cases, e.g. A function, transaction, feature, quality attribute, or structural element.

Test basis - answer-All documents from which the requirements of a component or system can be
inferred. The documentation on which the test cases are based. If a document can be amended only by
way of formal amendment procedure, then the test basis is called a frozen test basis.

Test Data - answer-Data the exists before a test is executed, and that affects or is affected by the
component or system under test. Example - in a database

Coverage (test coverage) - answer-The degree, expressed as a percentage, to which a specified coverage
item has been exercised by a test suite.

Test procedure specification (test procedure, test script, manual test script) - answer-A document
specifying a sequence of actions for the execution of a test.

Test Suite - answer-A set of several test cases for a component or system under test, where the post
condition of one test if often used as the precondition for the next one.

Incident - answer-Also known as deviation. Any event occurring that requires investigation.

Testware - answer-Artifacts produced during the test process required to plan, design, and execute tests,
such as documentation, scripts, inputs, expected results, set-up, and clear-up procedures, files, databases,
environment, and any additional software or utilities used in testing.

Regression testing - answer-Testing of a previously tested program following modification to ensure that
defects have not been introduced or uncovered in unchanged areas of the software, as a result of the
changes made. It is performed when the software or its environment is changed.

Exit Criteria - answer-The set of generic and specific conditions, agreed upon with the stakeholders, for
permitting a process to be officially completed. The purpose of exit criteria is to prevent a task from being
considered completed when there are still outstanding parts of the task that have not been finished. Exit
criteria are used to report against and to plan when to stop testing.

Test log - answer-A chronological record of relevant details about the execution of tests.

Test summary report - answer-A document summarizing testing activities and results. It is also contains
an evaluation of the corresponding test items against exist criteria.

Error Guessing - answer-A test design technique where the experience of the test is used to anticipate
what defects might be present in the component or system under test as a result of errors made, and to
design tests specifically to expose them.

, Independence of testing - answer-Separation of responsibilities, which encourages the accomplishment of
objective testing

Test policy - answer-A high level document describing the principles, approach, and major objectives
regarding testing.

Verification - answer-Confirmation by examination and through provision of objective evidence that
specified requirements have been fulfilled.

Validation - answer-Confirmation by examination and through provision of objective evidence that the
requirements for a specific intended use or application have been fulfilled.

V-model - answer-A framework to describe the software development lifecycle activities from
requirements specification to maintenance. The V-model illustrates how testing activities can be
integrated into each phase of the software development lifecycle.

Test level - answer-A group of test activities that are organized and managed together. A test level is
linked to the responsibilities in a project. Examples of test levels are component test, integration test,
system test, and acceptance test.

Integration - answer-The process of combining components or systems into larger assemblies.

Off-the-shelf software (commercial off-the-shelf software, COTS) - answer-A software product that is
developed for the general market, i.e. For a large number of customers, and that is delivered to many
customers in identical format.

Performance - answer-The degree to which a system or component accomplishes its designated functions
within given constraints regarding processing time and throughput rate.

Incremental development model - answer-A development lifecycle where a project is broken into a series
of increments, each of which delivers a portion of the functionality in the overall project requirements.
The requirements are prioritized and delivered in priority order in the appropriate increment. In some but
not all versions of this lifecycle model, each subproject follows a "mini V-model" with its own design,
coding, and testing phases.

Iterative development model - answer-A development lifecycle where a project is broken into a usually
large number of iterations. An iteration is a complete development loop resulting in a release (internal or
external) of an executable product, a subset of the final product under development, which grows from
iteration to iteration to become the final product.

Agile software development - answer-A group of software development methodologies based on iterative
incremental development., where requirements and solutions evolve through collaboration between self-
organizing cross-functional teams.

Agile manifesto - answer-A statement on the values that underpin agile software development. The values
are: individuals and interactions over processes and tools; working software over comprehensive
documentation; customer collaboration over contract negotiation; responding to change over following a
plan.

Efficiency testing - answer-The process of testing to determine the efficiency of a software product.

Documentinformatie

Geüpload op
5 september 2024
Aantal pagina's
22
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$9.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TOPDOCTOR
5.0
(1)
Verkocht
10
Volgers
5
Items
3387
Laatst verkocht
1 jaar geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen