CDS - EXAM 1 QUESTIONS AND ANSWERS
Labor and material payment bonds provide the necessary protection on public projects -
Answers -TRUE

Miller act corresponds with what.? - Answers -Labor and material payment bond

Architects should not advise owners and the legal sufficiency of required affidavits,
waivers, or releases of liens. - Answers -TRUE

Liens are not permitted on public projects. - Answers -TRUE

Architect must review, approve, and promptly submit shop drawings required by the
contract documents. - Answers -TRUE

An architect approved shop drawings which deviated from the contract documents. -
Answers -Changes in contract drawings must be submitted in writing to architect before
becoming affective, not equal to revisions within shop drawings.

Who is responsible for errors and omissions in shop drawings? - Answers -General
Contractor

Revisions not requested by the architect on resubmitted shop drawings don't require
architect's approval? - Answers -FALSE

Time extensions caused by the owner automatically entitle the contractor to monetary
damages? - Answers -FALSE

Standard AIA documents provided means by which the contractor may make a claim for
time extensions, monetary damages, or both. - Answers -TRUE

General requirements are often used to detail provisions related to scheduling and the
consequences of delays. - Answers -FALSE

What is required prior to the contractor submitting the first application for payment? -
Answers -Schedule of values

Many times the contractor is entitled to initial payment for site mobilization, preparation
of submittals, and other work that is not crucial to actual construction. - Answers -TRUE

By overstating the value of materials in understanding the value of labor? - Answers -
Front load

How can the architect prevent front loading from a contractor? - Answers -By carefully
reviewing the contractors schedule of values.

, If a contractor request payment for materials and equipment stored off-site or in transit?
- Answers -Special provisions

Bar charts show relationships between activities? - Answers -FALSE

Contractors issue certificates of payment to the owner? - Answers -Architects issue
certificates of payment to the owner, contractors issue applications for payment to the
architect, and then owners issue progress payments to the contractor.

If materials are stored offsite or in transit what is required by the contractor? - Answers -
Contractor must warrant to the owner and obtain title to materials and equipment free
and clear of liens and claims.

Each application of payment from contractor must be based on the approved schedule
of values. - Answers -TRUE

Retainage is usually between 5 and 10% in addition to the scheduled values of of work
related items? - Answers -TRUE

Architects have the right to nullify all or part of (previous certificates for payment)? -
Answers -TRUE

Architects can reject a payment request if? - Answers -Defective work not corrected

The contractors failure to pay subcontractors - Answers -Provides grounds to the
Architect in rejection a payment request.

Evidence that the contract work cannot be completed for the unpaid balance of the
contract sum. - Answers -Provides a substantial reason for the Architect to reject a
payment request.

A contractors stamp of approval on shop drawings means that the contractor has
already determined all criteria related thereto. - Answers -FALSE

AIA document B101 is used to outline the architects service obligations? - Answers -
TRUE

The architects responsibilities are re-stated within the AIA General Conditions Doc
A201. - Answers -TRUE

Contractors may not know what services the architect is obligated to perform if what
document is not part of the contract documents. - Answers -AIA Document B101

In review of shop drawings the general conditions Document A201 clearly states? -
Answers -Matters outside the scope of the design concept and the contract documents
are not reviewed.

Document information

Uploaded on
September 5, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(368)
Sold
2192
Followers
1449
Items
61786
Last sold
12 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions