ACTUAL QUESTION AND CORRECT ANSWERS
2023/2024 -RASMUSEN COLLEGE
, True - ANS✔✔--T or F: When installing the TAKE-345, you must ensure that the
transformer is supplying power to the power supply before the battery.
True - ANS✔✔--T or F: You are required to test signals from all secondary keypads
and key fobs even though they are not detection devices
12-24v - ANS✔✔--What is the input voltage range of the Doorbell Cam?
16.5 VAC - ANS✔✔--What is the output voltage of the transformer used to power the
SkyControl panel?
true - ANS✔✔--True or False: When programming a sensor into the sky panel you
can type in the serial number or "learn" it in by triggering the device
2 - ANS✔✔--When programming a DW21, which loop number is used?
1
2
3
beans and wire caps - ANS✔✔--Which of the following materials can you use to
group multiple ground terminals in a takeover module:
Solder
String
Wire Caps
Duct Tape
Beans
True - ANS✔✔--T or F: When installing the firefighter, it is required to test the
customer's existing smoke detectors
3/4" - ANS✔✔--When installing a DW21, what size bit should you use to drill the hole
for the sensor?
1/2"
3/8"
3/4"
1"
False - ANS✔✔--T or F: When running power to the TAKE-345 polarity does not
apply
- ANS✔✔--What is the correct height at which to install the PIR2?
7 ft
At least 5 ft
At least 7 ft