• Verkeerd document? Gratis ruilen
  • Geschreven door studenten die geslaagd zijn
  • Direct beschikbaar na je betaling
  • Online lezen of als PDF
Verkopen
Kies je studieland
Kies je taal
Document preview thumbnail
Voorbeeld 4 van de 87 pagina's
Tentamen (uitwerkingen)

WGU C215 Operations Management Question and answers 100% correct 2024

Document preview thumbnail
Voorbeeld 4 van de 87 pagina's

WGU C215 Operations Management Question and answers 100% correct 2024 WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality - correct answer Total Quality Management (TQM) Philosophy Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." - correct answer Process Capability Index (Cpk) A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. - correct answer Six Sigma The theoretical maximum output of a system in a given period under ideal conditions. - correct answer Design Capacity The capacity a firm ex

Voorbeeld van de inhoud

WGU C215 Operations Management -
Objective Assessment Prep Guide &
Terminologies Combo Study Guide
1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality - correct answer ✔Total Quality Management
(TQM) Philosophy


Basic function of Six Sigma. Measures the process potential and performance
of processes. The higher the range of Cpk, the improved is the ability of the
process to complete its necessities. Uses both the process variability and the
process specifications to determine whether the process is "capable." - correct
answer ✔Process Capability Index (Cpk)


A disciplined, data-driven approach and methodology for eliminating defects
(driving toward six standard deviations between the mean and the nearest
specification limit) in any process - from manufacturing to transactional and
from product to service. - correct answer ✔Six Sigma


The theoretical maximum output of a system in a given period under ideal
conditions. - correct answer ✔Design Capacity


The capacity a firm expects to achieve given its current operating constraints.
- correct answer ✔Effective Capacity

,proximity to customers, transportation, source of labor, community attitude,
proximity to suppliers, and many other factors. - correct answer ✔Location
Analysis


A type of process used to produce a large volume of a standardized product. -
correct answer ✔Line Processes


A type of process used to produce a small quantity of products in groups or
batches based on customer orders or specifications. - correct answer
✔Batch Processes


A type of process used to make a one-at-a-time product exactly to customer
specifications. - correct answer ✔Project Processes


A type of process that operates continually to produce a high volume of a fully
standardized product. - correct answer ✔Continuous Processes


Longest task in the process. - correct answer ✔Bottleneck


A type of automated system that combines the flexibility of intermittent
operations with the efficiency of continuous operations. - correct answer
✔Flexible Manufacturing System (FMS)


A technique for monitoring the flow of jobs between work centers. - correct
answer ✔Output/Input Control


The net increase created during the transformation of inputs into final outputs.
- correct answer ✔Value-Added

,Layouts that combine characteristics of process and product layouts. - correct
answer ✔Hybrid Layouts


Table that reflects opinions of managers with regard to the importance of
having any two departments close together. - correct answer ✔Relationship
Chart (REL)


The shortest distance between two locations using north-south and east-west
movements. - correct answer ✔Rectilinear Distance


Table that gives the number of trips or units of product moved between any
pair of departments. - correct answer ✔From-To Matrix


Schematic showing the placement of resources in a facility. - correct answer
✔Block Plan


The average of the observation times for each of the work elements. - correct
answer ✔Mean Observed Times


The mean observed time multiplied by the performance rating factor by the
frequency of occurrence. - correct answer ✔Normal Time


The length of time it should take a qualified worker using appropriate process
and tools to complete a specific job, allowing time for personal fatigue and
unavoidable delays. - correct answer ✔Standard Time


A philosophy designed to achieve high-volume production through elimination
of waste and continuous improvement. Based on a "pull" system rather than a

, "push" system. The three elements are just-in-time manufacturing, total quality
management, and respect for people. - correct answer ✔Just-in-Time (JIT)


A card that specifies the exact quantity of product that needs to be produced. -
correct answer ✔Kanban card


A philosophy of neverending improvement. - correct answer ✔Continuous
Improvement


Supplies materials or services directly to the processing facility. - correct
answer ✔Tier One Suppliers


Directly supplies materials or services to a tier one supplier in the supply
chain. - correct answer ✔Tier Two Suppliers


Directly supplies materials or services to a tier two supplier in the supply
chain. - correct answer ✔Tier Three Suppliers


Management of the flow of materials from suppliers to customers in order to
reduce overall cost and increase responsiveness to customers. - correct
answer ✔Supply Chain Management (SCM)


Determines the labor and machine resources needed to fill the open and
planned orders generated by the MRP. - correct answer ✔Capacity
Requirements Planning (CRP)


A system that uses the MRP, inventory record data, and BOM to calculate
material requirements. - correct answer ✔Material Requirements Planning
(MRP)

Documentinformatie

Geüpload op
31 augustus 2024
Aantal pagina's
87
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$13.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kan je een ander document kiezen. Je kan het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
flyhigher329
3.7
(61)
Verkocht
386
Volgers
175
Items
18498
Laatst verkocht
6 dagen geleden




Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen