100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NCCER EXAM #1 QUESTIONS WITH CORRECT ANSWERS

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
29-08-2024
Written in
2024/2025

NCCER EXAM #1 QUESTIONS WITH CORRECT ANSWERS

Institution
NCCER
Course
NCCER








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCER
Course
NCCER

Document information

Uploaded on
August 29, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCER EXAM #1 QUESTIONS WITH
CORRECT ANSWERS
Companies with strong safety cultures usually have lower _____. - Answer-a. turnover

Which of these is a true statement regarding safety? - Answer-a. Safety is a learned
behavior and attitude.

Poor lighting, excessive noise, and inadequate guards for moving parts are examples of
_____. - Answer-b. unsafe conditions

The activity that consists of breaking a job into its component tasks and then analyzing
each step for potential hazards is called a _____. - Answer-a. job safety analysis

A measure of the probability, consequences, and exposure related to an event is
referred to as _____. - Answer-c. risk

If there is a hole in the floor of a structure, the preferred method of protecting workers
from falls is to _____. - Answer-a. cover the opening and label the cover

The D-ring or support point on a safety harness should be placed _____. - Answer-a.
between the shoulder blades

A personal fall arrest system should be inspected monthly by a _____. - Answer-d.
competent person

Lanyards that have no shock-absorbing features are used for _____. - Answer-b.
positioning

When placing a ladder against a platform or roof, the top of the ladder should extend
above the point where the ladder touches the platform or roof by at least _____. -
Answer-b. 3 feet (91 cm)

When performing overhead work on scaffolding, what protective measures must be
taken to prevent objects from falling and striking a person below? - Answer-c.
Toeboards, debris nets, or canopies must be applied.

When stacking materials such as bricks or block, do not stack materials beyond a
_____. - Answer-b. 4:1 height-to-base ratio

Benching systems are prohibited in _____. - Answer-c. Type C soils

In the absence of other information, all soil in an excavation should be treated as if it is
_____. - Answer-c. Type C

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
250
Member since
2 year
Number of followers
68
Documents
18050
Last sold
1 week ago

4.0

38 reviews

5
22
4
4
3
6
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions