UST SERVICE TECHNICIAN EXAM 2024-2025
Type A Fire Extinguisher - Answer Puts out fires made of paper, wood, cloth, or
garbage.
Type B Fire Extinguisher - Answer Extinguishes flammable and combustible
liquids.
Type C Fire Extinguisher - Answer Puts out electrical fires.
What is the required frequency for monitor system certification under CCR, Title
23 UST Regulations? - ANSWER: 12 month
If visual monitoring is used to detect releases in a single-walled tank, it must be
done daily. - Answer daily.
The goal of spill and overfill protection devices is to reduce the possibility of a
discharge during _____. - Answer gasoline delivery.
Which of the following symptoms could indicate harmful petroleum exposure?
a. dizziness.
B. Tremors
b. Eye irritation.
d. All of the above - ANSWER. d. All of the aforementioned.
Under-dispenser containment is necessary for _____ subterranean storage tank
systems. - ANSWER ALL
, Except for..., all of the following statements apply to Automatic Tank Gauging.
a. The ATG system comprises a probe inserted in a tank.
c. ATG systems must be implemented in all UST systems.
c. ATG systems have a control panel that can provide information on product levels
and temperature.
d. ATG systems can be programmed to calculate changes in product volume to
identify if a tank is leaking. c. ATG systems must be implemented in all UST
systems.
CCR Title 23, UST regulations require spill containment to meet all of the
following conditions except:
a. Install on vent risers.
b. have a minimum capacity of five gallons.
c. gather any harmful substances.
d. have a drain valve or another way to keep the spill container empty - ANSWER
a. Install on vent risers.
Suction piping may not require leak detection if it only has one check valve, but
where? - Answer immediately below the suction pump.
Service technicians who work on monitoring equipment must be trained by _____.
- Respond to the manufacturer of the item.
Air monitoring is required when undertaking work in a restricted location. -
ANSWER Before and throughout.
Type A Fire Extinguisher - Answer Puts out fires made of paper, wood, cloth, or
garbage.
Type B Fire Extinguisher - Answer Extinguishes flammable and combustible
liquids.
Type C Fire Extinguisher - Answer Puts out electrical fires.
What is the required frequency for monitor system certification under CCR, Title
23 UST Regulations? - ANSWER: 12 month
If visual monitoring is used to detect releases in a single-walled tank, it must be
done daily. - Answer daily.
The goal of spill and overfill protection devices is to reduce the possibility of a
discharge during _____. - Answer gasoline delivery.
Which of the following symptoms could indicate harmful petroleum exposure?
a. dizziness.
B. Tremors
b. Eye irritation.
d. All of the above - ANSWER. d. All of the aforementioned.
Under-dispenser containment is necessary for _____ subterranean storage tank
systems. - ANSWER ALL
, Except for..., all of the following statements apply to Automatic Tank Gauging.
a. The ATG system comprises a probe inserted in a tank.
c. ATG systems must be implemented in all UST systems.
c. ATG systems have a control panel that can provide information on product levels
and temperature.
d. ATG systems can be programmed to calculate changes in product volume to
identify if a tank is leaking. c. ATG systems must be implemented in all UST
systems.
CCR Title 23, UST regulations require spill containment to meet all of the
following conditions except:
a. Install on vent risers.
b. have a minimum capacity of five gallons.
c. gather any harmful substances.
d. have a drain valve or another way to keep the spill container empty - ANSWER
a. Install on vent risers.
Suction piping may not require leak detection if it only has one check valve, but
where? - Answer immediately below the suction pump.
Service technicians who work on monitoring equipment must be trained by _____.
- Respond to the manufacturer of the item.
Air monitoring is required when undertaking work in a restricted location. -
ANSWER Before and throughout.