Erosion and Sediment Control exam questions with 100- correct answers

Content preview

Erosion and Sediment
Control exam questions with
100% correct answers

Minimum Standard 1 - answer Stabilization


permanent or temporary soil stabilization shall be
applied to denuded areas within seven days after
final grade is reached on any portion of the site;
temporary soil stabilization shall be applied within
seven days to denuded areas that may not be at
final grade but will remain dormant for longer than
14 days; permanent stabilization shall be applied
to areas that are to be left dormant for more than
one year


Site NOT at Final Grade - answer - stabilize in 14
days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - answer - stabilize in 7 days
(recommended immediately)
- permanently or temporarily seed and mulch

,- mulch/matting/straw


Minimum Standard 2 - answer Stock Piles, Waste
and Borrow Areas


during construction, soil stock piles and borrow
areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface
from raindrop impact and silt fence intercepts and
detains from disturbed areas


Minimum Standard 3 - answer Permanent
Vegetation


permanent vegetation cover shall be established
on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be
considered established until a ground cover is
achieved that is uniform, mature enough to
survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from
disturbed area

,this is the standard used to verify that a site is
ready for release of bonds or surety


Minimum Standard 4 - answer First-Step Measures


Sediment basins and traps, perimeter dikes,
sediment barriers and other measures intended to
trap sediment shall be constructed as a first step
in any land-disturbing activity and shall be made
functional before upslope land disturbance takes
place


a certain amount of initial land disturbance may be
required to provide access for equipment to install
the perimeter controls, but site clearing and
grading should be kept to a minimum until the
perimeter controls are in place


intercepts and detains small amounts of sediment
from disturbed areas during construction operation
to prevent sediment from leaving the site and
decrease velocity of sheet flows and low-to-
moderate level channel flow


Perimeter Controls - answer assures that sediment
does not leave the perimeter of the land-disturbing
area once site clearing, grading, and construction
commences

, Examples: silt fences, sediment traps, sediment
basins, construction entrance, temporary
diversions, diversions


Minimum Standard 5 - answer Earthen Structure
Stabilization


stabilization measures shall be applied to earthen
structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce
damage from sediment and runoff to downstream
or off-site areas


Minimum Standard 6 - answer Traps and Basins


sediment traps and basins shall be designed and
constructed based upon the total drainage area
(not just disturbed area) to be served by the trap
or basin


Sediment Traps - answer minimum storage
capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas
less than 3 acres

Document information

Uploaded on
August 25, 2024
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GUARANTEEDSUCCESS
4.3
(253)
Sold
695
Followers
314
Items
24783
Last sold
22 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions